Final approval of matters related to the safe design, build, operation, maintenance, and disposal of indnstry systems (official signature for safety... [Pg.323]

I should like to plead for the extension of thinking on the future maintenance of structures. Structures should be engineered for safe building and at the same time their safe maintenance should be considered and provision made, where necessary, for the fixing of cradles, and so on, needed for painting and other maintenance works. [Pg.104]

The section on components deals with all materials that may be used in the manufacture, processing, and packaging of drug products, plus materials used for maintenance of the building and equipment. They must be stored and handled in a safe, sanitary, and orderly manner. These precautions are needed to prevent mix-ups and cross-contamination of drugs and drug products. All items should be held until they have been sampled and tested according to the company s specifications and not released until the tests have been completed. In this section it is required that ... [Pg.639]

Most LNG vehicles provide a manifold to capture natural gas vented from the LNG tank and direct it to a safe location outside of the vehicle, usually near the top of the vehicle where the vented natural gas will rise and dissipate safely. For vehicle maintenance facilities, exhaust systems with explosion-proof blowers and motors should be provided. When the vehicle is brought inside for maintenance, the exhaust system hose is placed over the LNG vent and the system is turned on. Any vented natural gas vapor is then safely removed from the building. For vehicle parking facilities, this is usually not a practical solution fc - cost and implementation reasons. [Pg.153]

System maintenance and reliability are very important, so be sure to consider this in every step of your design. Engineering a practical and safe fuel cell power supply takes a bit of thought. It is best to start out small and build up slowly, so that your mistakes do not turn out to be costly or dangerous mistakes. [Pg.245]

Under an annually renewed, systemwide contract with WGI, Rockwell Automation works with all of the incineration sites through surveys and visits to forecast requirements for control system spares (based on historical and forecast spares depletion rates), establish certified spares inventory levels for each site, repair or rebuild failed parts and components, and to special-build new parts and circuit cards as needed to keep maintenance inventories at a safe operational level. The Rockwell Automation support group, located in Cleveland, Ohio, also implemented a relatively simple soft-... [Pg.31]

Maintenance to most occupants of the buildings involves work either in their immediate area or directly affecting their area. An exception is the electrical panel which controls the breakers to electrical circuits within a laboratory. As noted earlier, there are reasons why employees other than maintenance personnel will need (sometimes urgently) to deactivate electrical circuits, and if proper isolation of the panels is done to prevent access to active electrical wiring, the breaker panel closets can be made safely accessible. [Pg.140]

The activities under the 5 framework programme in the field of ageing build further on the activities conducted under the 4 framework programme, considering aspects of both safety and cost. The objectives are to develop a common basis for the continued safe operation and prolonging the safe operational life-spans of existing nuclear installations and to develop better methods for their inspection, maintenance and management. [Pg.19]

If lead work is incorporated into repair or renovation work, it can be done more cost effectively. In the case of rental property, it is more efficient to do lead work when the property is turned over and routine maintenance is being done. If the job is done according to building code, the additional cost of lead hazard reduction and safe work practices will usually add no more than 30% to the cost of the job. ... [Pg.104]


See other pages where Building, safe maintenance is mentioned: [Pg.431]    [Pg.194]    [Pg.544]    [Pg.784]    [Pg.478]    [Pg.406]    [Pg.3]    [Pg.139]    [Pg.151]    [Pg.85]    [Pg.126]    [Pg.212]    [Pg.137]    [Pg.668]    [Pg.14]    [Pg.19]    [Pg.61]    [Pg.139]    [Pg.283]    [Pg.285]    [Pg.123]    [Pg.180]    [Pg.245]    [Pg.176]    [Pg.578]    [Pg.19]    [Pg.428]    [Pg.406]    [Pg.452]    [Pg.411]    [Pg.715]    [Pg.816]    [Pg.146]    [Pg.229]    [Pg.228]    [Pg.74]    [Pg.534]    [Pg.39]    [Pg.111]   
See also in sourсe #XX -- [ Pg.184 ]

See also in sourсe #XX -- [ Pg.181 ]




SEARCH



Maintenance buildings

© 2024 chempedia.info