Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

The Management of Performance

Even if the company does not operate a full performance related pay system, R D Managers can still apply the principles used in performance management to good effect and hence get the best out of their staff. However, to be really effective, performance management must in some way be connected, however loosely, to a system of reward. [Pg.39]


We found that an aspirant to top performance, whether in chemicals or other industries, must follow a balanced approach to the management of performance., i.e., what the organization needs to accomplish today, and health, or how it can improve or adjust its performance over time. Integrated performance and health management enables an organization to deliver value today while simultaneously... [Pg.315]

Where technology is central to competitive success, such a breakdown in the management of technology can become a serious threat to long-term corporate performance. This situation has created a challenging environment for technology leaders as they stmggle to reestabUsh their credibility and reassert their leadership in the business. [Pg.126]

The use of the computer in the design of chemical processes requires a framework for depiction and computation completely different from that of traditional CAD/CAM appHcations. Eor this reason, most practitioners use computer-aided process design to designate those approaches that are used to model the performance of individual unit operations, to compute heat and material balances, and to perform thermodynamic and transport analyses. Typical process simulators have, at their core, techniques for the management of massive arrays of data, computational engines to solve sparse matrices, and unit-operation-specific computational subroutines. [Pg.64]

A PHA has heen performed for new facilities. The management of change documentation packages and referenced documents should indicate when a process hazard analysis was performed for the modification or new facility. The PSSR Team should verify all of the PHA recommendations have been implemented or otherwise resolved before the toll process can be judged ready to operate. [Pg.97]

An overall review of the management of change documentation package should be performed to ensure documentation update items (including material safety data sheets) are addressed and that PHA action items are complete. This can be done by one person but is often best achieved by a PSSR Team. The process needs to account for ... [Pg.98]

Any eontraetor being eonsidered for an award must have a history of performing work in a safe manner. The authors believe that if a eontraetor has performed work safely in the past, it is likely that the management of the eontraetor will believe in and praetiee safe work performanee as part of its present and future business philosophy. [Pg.213]

The intent of this requirement is to provide a means for assuring management of performance and alerting them to potential and actual problems. Management need to know whether projects are proceeding on course and hence periodic reporting is necessary to provide management with factual data on which to make decisions. The results of these measurement should be reported at the planned project reviews as required by clause 4.2.4.3. [Pg.198]

No proposal for a laboratory ventilation system should be requested without a thorough study of the work to be performed. A once-through system may not always be required. The manager of a research laboratory, working closely with a designer, discovered that 50% recirculation would be permissible in their new building. While this is even less than in offices and stores, it proved to be adequate for their type of work. He would not recommend this ratio for other laboratories without a careful study. [Pg.33]

TeleStroke consultation can therefore be performed quickly. Its efficiency compares quite favorably to the management of patients in rural Ontario" who receive rt-PA after transfer from a rural hospital to a tertiary-care center (the so-called ship and drip model). The patients located in mral Ontario had a mean total time of 138 minutes between presentation at the rural facility and dmg delivery at the tertiary-care center. The door-to-bolus time at the community hospitals linked to our TeleStroke service was 106 minutes, only 36 minutes longer than that measured by the urban acute stroke service in Houston, which permitted a mean door-to-bolus time of 70 minutes. Whereas the door-to-consult time within a telemedicine system may decrease with training and practice, interfacility transfer times, such as those observed in Ontario, are not easily shortened. [Pg.224]

Bone disease is a common manifestation of multiple myeloma. Bisphosphonates should be initiated in symptomatic patients with bone lesions to slow osteopenia and reduce the fracture risk associated with the disease. Pamidronate and zolendronic acid have equivalent efficacy in the management of osteolytic lesions, but because of relative ease of administration, zolendronic acid is used most frequently.43 The use of zolendronic acid decreases pain and bone-related complications and improves quality of life. The suggestion that bisphosphonates have direct antimyeloma activity, based on the ability to inhibit NF-kB signaling, remains controversial. Recent cases of osteonecrosis of the jaw have been a major concern. Risk factors are unclear, but osteonecrosis of the jaw is more common in patients receiving intravenous administration of bisphosphonates and having dental procedures performed. It is recommended that patients... [Pg.1423]

O A risk assessment should be performed at presentation of febrile neutropenia to identify low-risk patients for potential outpatient treatment (see Table 96-3). Patients who do not meet low-risk criteria should be hospitalized for parenteral administration of broad-spectrum antibacterials. The IDSA has published evidence-based guidelines for the management of febrile neutropenia5,12 (Fig. 96-1). The choice of initial antimicrobial agent(s) depends on the following factors ... [Pg.1471]

U.S. EPA s recommendations regarding stack emission tests, which may be performed at hazardous waste combustion facilities for the purpose of supporting MACT standards and multipathway, site-specific risk assessments, where such a risk assessment has been determined to be necessary by the permit authority, can be found in the U.S. EPA document on Risk Burn Guidance for Hazardous Waste Combustion Facilities.32 The applicability of the new standards has been demonstrated in the management of hazardous waste incinerators, whose performance was shown to clearly surpass the regulatory requirements in all tested areas.33... [Pg.979]


See other pages where The Management of Performance is mentioned: [Pg.22]    [Pg.37]    [Pg.39]    [Pg.41]    [Pg.43]    [Pg.45]    [Pg.47]    [Pg.51]    [Pg.53]    [Pg.55]    [Pg.149]    [Pg.22]    [Pg.37]    [Pg.39]    [Pg.41]    [Pg.43]    [Pg.45]    [Pg.47]    [Pg.51]    [Pg.53]    [Pg.55]    [Pg.149]    [Pg.191]    [Pg.93]    [Pg.118]    [Pg.106]    [Pg.30]    [Pg.13]    [Pg.93]    [Pg.334]    [Pg.96]    [Pg.1212]    [Pg.18]    [Pg.29]    [Pg.122]    [Pg.201]    [Pg.53]    [Pg.569]    [Pg.501]    [Pg.776]    [Pg.1444]    [Pg.174]    [Pg.967]    [Pg.91]    [Pg.132]    [Pg.205]    [Pg.313]    [Pg.334]   


SEARCH



Performance management