Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Repair possibilities

Moderate Possible deformation of structural members, short of failure. Building may be reusable with repair. Possibly some debris. Personnel injury from debris is likely. >100.07)... [Pg.109]

Repair possibilities a significant thermoplastic advantage for large parts... [Pg.26]

The clinical application of alkaloids involves them as agents to regulate mescaric cholinergic receptor activity and repairing possible disturbances or to correct possible defects. Atropine, hyoscine and hyoscyamine may all have these kinds of applications. [Pg.185]

In addition to the demands on the properties of the product, economic criteria have to be considered (e.g., mechanical strength, optics, repair possibilities). The ability to automate processes and design products with the manufacturing process view are important points to focus on. Therefore, examples of the joining techniques in automation presented are given here. [Pg.410]

High rain and acoustic noise transmission Resistant to impact damage from blunt but not sharp objects. Patch repair possible - ... [Pg.403]

The example system was modelled using the Monte Carlo simulation algorithm described. The faults that are considered in order to prescribe the dispatch criteria for the system are the components Ai, Ai, B, Bi and C. At maintenance, the minimum amoimt of repair possible is implemented. Referring back to the example in Fig. 4, this would equate to repairing only... [Pg.672]

Is self-repair possible in inorganic materials as it is in organisms If not, why not If so, how and to what extent could that be built into materials ... [Pg.342]

Prompt gamma measurements Medium-high Up to 10000 n-type repairable Possible absorber for X-rays, risk of neutron damage... [Pg.222]

Furthermore, the specific cost of the material, calculated after the cost of components and execution, is only a small part of the total cost, which also comprises maintenance cost of various kinds, including repairs, possible replacement, breaks in normal exploitation, etc. Using high performance materials, smaller dimensions of structures are necessary, and lower maintenance cost may be expected. There are also other advantages already Eiger (1933) has observed that high performance concrete elements may be subjected very early to partial service loads. All these factors decide upon the total cost of the entire structure. As a result, apparently expensive composite materials appear very interesting economically (Malier 1992 CEB 1989). [Pg.510]

Finally a new system for monitoring of released radioactivity with the new exhaust air system was designed and built. Govemraoit authorities requested a system with advanced sensibility for low emissions of tritium and carbon-14. The design especially had to consider the highest mean time between failures and the lowest mean time to repair possible. [Pg.287]

Treatment of biomineralization-related diseases like bone or teeth defects etc. with repair possibilities as well as implant design. [Pg.68]

Table 1 shows the occurrenee ratio of UCl, UC2, and UC3 contribution in total CDF due to pump trip event. In case of repair possibility, the probability of consequence, UC2, can be reduced to a lower value after real-time repair, as shown by UC2 in Figure 6. Thus, the CDF can be minimized to a significant value practically. The probability value of UC2 can be calculated by taking into account of modified top event probabilities using RFT analysis. An example of RFT quantification is given in next Section 3.2.2. [Pg.1616]

Table 2. RFT results with and without the repair possibility. Table 2. RFT results with and without the repair possibility.
Figure 7 indicates that the top event probability with recovery possibility can be reduced up to 45% with respect to the probability of failure without any repair possibility. Though the reduction in probability failure can vary with the input data of failure rate and repair rate. [Pg.1617]

However, the future PSA studies of DHR system with repair possibility should consider the common cause failure in RET and RFT analysis to get clearer outline of the benefits. Moreover, the assumptions on exponential failure and repair distribution should be relaxed in RFT quantification as the failure and repair distribution in reality are non-exponential for mechanical and reactive systems. [Pg.1617]


See other pages where Repair possibilities is mentioned: [Pg.30]    [Pg.865]    [Pg.170]    [Pg.39]    [Pg.2726]    [Pg.566]    [Pg.260]    [Pg.359]    [Pg.361]    [Pg.253]    [Pg.38]    [Pg.1550]    [Pg.1615]    [Pg.2210]   
See also in sourсe #XX -- [ Pg.26 , Pg.30 ]




SEARCH



© 2024 chempedia.info