Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Repair metal

In the Far East and in the USA hardly any electronic piece of equipment leaves its factory without first having been adjusted with a ceramic screwdriver. However, this tool is only rarely used in European companies. In the electronics branch ceramic screwdrivers are important tools both for producing and repairing. Metal screwdrivers can for example affect equipment in which frequencies need to be adjusted. They can cause short-circuits and transfer static electricity form a person to the device. In order to prevent these problems the use of a ceramic screwdriver is recommended. [Pg.299]

Oxyacetylene welding is used to repair metal structures, including bridges, buildings, and even the Statue of Liberty. Calculate AS° for the combustion of 1 mol of acetylene (C2H2). [Pg.678]

Such coating systems must ensure optimal bonding to the metallic substrate and be compatible with a variety of top coats. Anticorrosive primers of this kind are currently undergoing large-scale industrial tests a product for the home handyman for repairing metal parts affected by rust is also in the test phase. [Pg.505]

It must conduct ionically not electronically. There must be no conductive filler such as carbon or a metal. Zinc is used in some patch materials to minimize the incipient anode effect, they must not be used for any electrochemical process repairs. Metals or carbon fibres must not be used either. [Pg.183]

Body putty n. A paste-like mixture of plant resin, often a polyester, and a filler such as talc, used to smooth and repair metal surfaces such as auto bodies. [Pg.120]

Typical Use Aerospace repairs. Metals and composites. BR127 primer Typical Use Aerospace. Engine nacelles. Metals (sheets and ... [Pg.175]

Typical Use General purpose, instant domestic repairs. Metal, wood, concrete, GRP. ceramics. [Pg.181]

Composite patches may also be used to repair metallic structures, and recent studies have indicated the potential of such repairs for naval and offshore structures (e.g., Bowditch et al. 2004 Turton et al. 2005). These may be applied, using infusion or preimpregnated materials, or adhesively bonded, and can be applied to repair fatigue cracks, corrosion damage, or for reinforcement purposes. Advantages over metallic repair are ... [Pg.1259]

Madelpech, P., Juaneda, S., Pradels, M., 2009. Bonded composite patch to repair metallic structures fatigue behaviour of a dishond. In Proceeding of 17th International Conference on Composite Materials, July. [Pg.207]

Insurance in pressure boundary integrity of NPP unit is strongly influenced by technical capabilities and efficiency of metal examination system. Ordinary ultrasonic examination tools and procedures have limitations in flaw sizing and positioning. The problems arise for welds and repair zones of welds made by filler materials of austenitic type. [Pg.194]

Representative set of weldments was examined site welds (with pearlitic type weld metal) and two types of site weld repair zones with different welding technologies using Cr-Ni filler metals and Ni-based alloy. Results of AUGUR 4.2 inspection were compared with manual ultrasonic inspection ones in terms of defect detection, characterization, positioning and sizing in order to estimate correlation between these data. [Pg.195]

Insufficient information about the properties, layout pattern of small defects, potential for their growth in time, usually leads either to an unjustified rejection (repair) or to underestimation of the importance of the defect and, as aconsequence, construction failure. Use of automated computerised means of control allows safe service of the old constructions, periodically repeating the UT and monitoring the development of discontinuities in the metal. The main idea of such policy is periodical UT of development of discontinuities or, in a more general form, monitoring of the metal condition. [Pg.791]

As a part of the power demonstration program of the AFC in the 1950s, the Enrico Fermi fast breeder reactor (Fermi-1) was built near Detroit by a consortium of companies led by Detroit Edison. Fermi-1 used enriched uranium as fuel and sodium as coolant, and produced 61 MWe. It suffered a partial fuel melting accident in 1966 as the result of a blockage of core coolant flow by a metal plate. The reactor was repaired but shut down permanently in November 1972 because of lack of binding. Valuable experience was gained from its operation, however (58). [Pg.221]

Passivating (anodic) inhibitors form a protective oxide film on the metal surface they are the best inhibitors because they can be used in economical concentrations and their protective films are tenacious and tend to be rapidly repaired if damaged. [Pg.269]


See other pages where Repair metal is mentioned: [Pg.202]    [Pg.40]    [Pg.41]    [Pg.328]    [Pg.535]    [Pg.48]    [Pg.38]    [Pg.226]    [Pg.202]    [Pg.40]    [Pg.41]    [Pg.328]    [Pg.535]    [Pg.48]    [Pg.38]    [Pg.226]    [Pg.922]    [Pg.343]    [Pg.344]    [Pg.417]    [Pg.121]    [Pg.419]    [Pg.77]    [Pg.331]    [Pg.133]    [Pg.135]    [Pg.45]    [Pg.80]    [Pg.391]    [Pg.54]    [Pg.94]    [Pg.465]    [Pg.466]    [Pg.279]    [Pg.330]    [Pg.104]    [Pg.295]    [Pg.354]    [Pg.363]    [Pg.6]    [Pg.283]   
See also in sourсe #XX -- [ Pg.81 , Pg.82 ]




SEARCH



© 2024 chempedia.info