Project plot siting is very important for revamp projects. A careful review of the surrounding facilities is also necessary. Some of the important considerations are  [Pg.63]

Review of surrounding plants/facilities Existing pipe racks Maintenance and operations access Sewers and storm water drainage Existing fire and radiation circles Hazardous chemical releases from upwind locations Existing electrical area classification Close access to substations [Pg.63]

Close access to raw materials, utilities, flare network and product storage area Future population encroachment Noise generated at the surrounding facilities [Pg.63]

What-lf Question Cause Consequence Severity Likelihood RL Safeguards Rec Recommendations [Pg.64]

Tube skin temperature Excessive heat load Meltdown and 2 M M High tube 1.1 1. To consider auto [Pg.64]


First, the importance of learning lessons from past process safety incidents is highlighted in Section 3.2. The subsequent section presents preliminary hazard review procedure, risk matrix, what-if method, plot plan and layout review, pressure relief system review and fire safety design aspects. Section 3.4 presents PHA techniques and procedures hazards and operability analysis (HAZOP), failure modes and effects analysis (FMEA), instrumented protective system (IPS) design, fault trees, event trees, layer of protection analysis (LOPA) and finally SIS life eyele. The importanee of revision of PSI is highlighted in Seetion 3.5. [Pg.58]


See other pages where Plot plan and layout review is mentioned: [Pg.58]    [Pg.63]   
See also in sourсe #XX -- [ Pg.58 , Pg.63 ]




SEARCH



Layout planning

Layout plot plan

Plan layouts

Planning reviews

Plot plans

Plot plans planning

© 2024 chempedia.info