Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Operator rank

Eq. (120) is the same commutation relation as is satisfied by the generators of the unitary group U(n), the group of all n-dimensional unitary matrices. For this reason, the operators are often referred to as generators " . The operator rank reductions shown in Eqs (120) and (121) prove to be important in some of the following derivations. [Pg.93]

Ol must be incorporated in a correct treatment of transition matrix elements or excited-state properties. A useful way of eliminating this problem is to employ a commutator expression for the transition matrix element Oj]10>, where d is the transition operator. This form has the advantage of the reduction of operator rank due to the commutator. ... [Pg.16]

The accumulation of soil phosphorus associated with manure application from intensive animal operations ranks amongst the greatest threats to water quality in agricultural regions (Sims et al., 2000). Organic phosphorus can be a large proportion of the total phosphorus in animal manures (Barnett, 1994), and may play a key role in determining the impact of manure application on phosphorus transfer. In particular, there is considerable current interest in the role of manure-derived myo-inositol hexa-kisphosphate in the phosphorus transfer process (see below). [Pg.284]

List scheduling, with operations ranked according to their urgency (the minimum number of cycles required between the operation and any enclosing timing constraints). [Pg.48]

List scheduling, with operations ranked according to their mobility, and operations with lower mobilily scheduled before scheduling operations with higher mobilily. An operation s mobility is the number of control steps that it can possibly be delayed from its ASAP control step, i.e. the difference between its ALAP control step and its ASAP control step. Thus operations with a mobility equal to zero are on the critical path, and are scheduled first. If two nodes have the same mobility, the node with the most successors is scheduled first. [Pg.143]

Most people who lead and manage organizations got there through the operational ranks. They did not spend much time thinking about, or charting, the direction of the company. [Pg.103]

Before considering the evaluation and simplihcadon of commutators and anticommutators, it is useful to introduce the concepts of operator rank and rank reduction. The (particle) rank of a string of creation and annihilation operators is simply the number of elementary operators divided by 2. For example, Ihe rank of a creation operator is 1/2 and the rank of an ON operator is 1. Rank reduction is said to occur when the rank of a commutator or anticommutator is lower than the combined rank of the operators commuted or anticommuted. Consider the basic anticommutation relation... [Pg.25]

The spin operator S is an irredueible tensor of rank one with the following transformational properties... [Pg.619]

To verify that the Fischer jjrojection has the R configuration at its chirality center rotate the three dimensional representation so that the lowest ranked atom (H) points away from you Be careful to maintain the proper stereochemical relationships during the operation... [Pg.294]

In the dyestuff industry, anthraquinone still ranks high as an intermediate for the production of dyes and pigments having properties unattainable by any other class of dyes or pigments. Its cost is relatively high and will remain so because of the equipment and operations involved in its manufacture. As of May 1991, anthraquinone sold for 4.4/kg in ton quantities. In the United States and abroad, anthraquinone is manufactured by a few large chemical companies (62). At present, only two processes for its production come into consideration manufacture by the Friedel-Crafts reaction utilizing benzene, phthahc anhydride, and anhydrous aluminum chloride, and by the vapor-phase catalytic oxidation of anthracene the latter method is preferred. [Pg.424]

The objective is to apply a sequence of elementary row operations (39) to equation 25 to bring it to the form of equation 22. Since the rank of D is 3, the order of the matrix is (n — r) x n = 2 x 5. The following sequence of elementary row operations will result in the desired form ... [Pg.107]

Porosity ranks next to thickness in importance, especially when the finishes must serve in polluted and/or humid environments which promote tarnish and corrosion. Pores, openings in the surface that extend to the underplate or substrate, can be intrinsic in the coating (14), or can be produced by mechanical wear or by forming operations involved in manufacturing. In some environments the substrate can tarnish or corrode at pore sites and can produce localized areas of insulating films which cause contact resistance to increase. Porosity is less important for connectors that operate indoors at moderate to low relative humidities and in the absence of corrosive pollutants (15). [Pg.31]

Phase 3 - Process Planning. The important design characteristics from Phase 2 are ranked with key process operations, where quantification yields actions to improve the understanding of the processes involved and gain the necessary expertise early on. The critical process operations highlighted are then carried forward to the next phase. [Pg.302]

Phase 4 - Production Planning. The critical process operations from Phase 3 are ranked with production requirement issues, ultimately translating the important customer requirements to production planning and establishing important actions to be taken. [Pg.302]

Rank the control systems shown in Fig. 30-1 according to their relative capital construction and operation costs. [Pg.522]

Now that you have determined the likely savings in terms of annual process and waste-treatment operating costs associated with each option, consider the necessary investment required to implement each option. Investment can be assessed by looking at the payback period for each option that is, the time taken for a project to recover its financial outlay. A more detailed investment analysis may involve an assessment of the internal rate of return (IRR) and net present value (NPV) of the investment based on discounted cash flows. An analysis of investment risk allows you to rank the options identified. [Pg.383]

Sondreal, 1993. Everett A. Sondreal, "Clean Utilization of Low-Rank Coals for Low-Cost Power Generation," from "Clean and Efficient Use of Coal The New Era for Low-Rank Coal," Organization for Economic Co-Operation and Development/International Energy Agency, Paris, France, 1993. [Pg.495]

Ranking equipment and teehnology options for an intended applieation then beeomes a matter of seleeting those projeet options with the shortest paybaek period. So, for example, if we compare a baghouse versus an electrostatic filter for a dust control application, an overall payback period for each option can be determined based on the capital investment for each piece of equipment, operating, maintenance, power costs, and other factors. [Pg.502]


See other pages where Operator rank is mentioned: [Pg.89]    [Pg.14]    [Pg.14]    [Pg.22]    [Pg.9]    [Pg.1568]    [Pg.30]    [Pg.141]    [Pg.25]    [Pg.89]    [Pg.14]    [Pg.14]    [Pg.22]    [Pg.9]    [Pg.1568]    [Pg.30]    [Pg.141]    [Pg.25]    [Pg.37]    [Pg.1503]    [Pg.497]    [Pg.498]    [Pg.498]    [Pg.89]    [Pg.145]    [Pg.159]    [Pg.60]    [Pg.414]    [Pg.539]    [Pg.235]    [Pg.249]    [Pg.269]    [Pg.269]    [Pg.282]    [Pg.107]    [Pg.69]    [Pg.20]    [Pg.18]    [Pg.268]    [Pg.584]   
See also in sourсe #XX -- [ Pg.9 , Pg.10 , Pg.14 , Pg.15 ]




SEARCH



First-rank tensor operator

Operators Second-rank tensor

Rank

Rank of operators

Ranking

Submatrix Ranking Operators

© 2024 chempedia.info