Open-hole section drilling

Annulus flow around the drill pipe in the open hole section... [Pg.838]

If long open-hole sections are drilled in areas of high geothermal gradient, thermal destabilization may occur. A diagnostic criterion is if the source of large-scale sloughing is from the shales at the shoe rather than from further downhole. [Pg.580]

An example of the typical safety problem that can occur when completing these wells is when a 6 in. open hole has been drilled below the last casing (or liner) shoe. The open section of the borehole is usually to be cased with a 4 in. liner. The liner is to be lowered into the open hole on a liner hanger that is made up to 3- in. drill pipe. It is assumed that prior to the liner operation, drilling had been under way thus the stripper rubber in the rotating... [Pg.849]

Most squeeze cementing operations take place in cased sections of a well. However, open-hole packers can be used to carry out squeeze cement operations of thief zones during drilling operations. [Pg.1225]

The European HDR project site at Soultz-sous-Forets is located on a local horst structure in the Rhine Graben, where Hercynian age granites are covered by a 1.4 km thick sedimentary section (Baria et al., 1999). Well GPK-1 was drilled to 3,590 m depth (open hole below 2,850 m depth), and since 1987 it has been used for a number of... [Pg.691]

The fabrication of all trays may be punched or drilled (more expensive) with 1410 holes, and those in the lower section have blank strips placed over the inlet and outlet edge rows until approximately 1223 holes are left open in the top section above the feed tray. [Pg.199]

Certain basic facts must be observed in the manufacture of molds. Flat surfaces should be avoided if possible, because slight domes or dish effects will allow the sheet to stretch over the entire surface. The curved surface prevents the slight bumps that usually may appear in flat sections. Maximum allowable vent hole diameters will vary with materials and sheet thickness. Air evacuation holes should be as small as possible and to minimize restriction of plastic flow through vent holes, the openings should be back drilled mold surface, as reviewed above. [Pg.319]

Horizontal wells can be drilled with a larger well spacing than vertical wells and, like vertical wells, may be completed open or cased hole. Recent innovations such as multibranches and multilegs off of the main section increase the efficiency and productivity of horizontal wells (12, 13). However, new technology is still needed to overcome difficulties associated with the use of horizontal wells, such as effective clean-out... [Pg.407]

Exit the drill pipe change drill into a special nozzle while change drill pipe into one with smaller diameter which conducive to the discharge cinder, open emulsion pump and drilling machine at the junction of coal and rock, feed drill pipe into drill hole slowly, retrograding drill pipe while punching when reach the max depth, so circulates until ran out of coal and backwater became clear. Then add drill pipe until all coal section rushed out according to such method. [Pg.288]

In the press section the individual rolls are hard or soft covered. The press nip (Fig. 6.7) is created either by two profiled rolls or by a combination of one profiled and one plain roll. Covers with high open surface area, similar to tyre technology, offer the necessary storage capacity for the water squeezed out in the press nip. The various surface designs include grooves, blind drilled holes or suction holes as well as combinations of these. [Pg.231]

Drilling fluids - Coarse, hammermilled (+10 mesh) mica is used in water-based oilwell drilling fluids to prevent fluid loss into porous rock formations. The coarse mica flakes bridge openings and seal porous sections of the drill hole against loss of circulation. Mica s platy nature also aids in the suspension of drilling fluid solids and cuttings. [Pg.47]


See other pages where Open-hole section drilling is mentioned: [Pg.576]    [Pg.576]    [Pg.849]    [Pg.1207]    [Pg.53]    [Pg.53]    [Pg.579]    [Pg.794]    [Pg.346]    [Pg.369]    [Pg.365]    [Pg.51]    [Pg.82]    [Pg.3397]    [Pg.82]    [Pg.45]    [Pg.381]    [Pg.609]    [Pg.139]    [Pg.381]    [Pg.98]    [Pg.30]    [Pg.138]    [Pg.98]    [Pg.2824]    [Pg.139]    [Pg.120]    [Pg.28]    [Pg.180]    [Pg.45]    [Pg.246]    [Pg.217]    [Pg.143]    [Pg.180]   
See also in sourсe #XX -- [ Pg.4 , Pg.53 ]