Given a regular fraction of a 2f experiment and independent response variables, the estimators described above have constant variance even if the individual response variables do not. Also, the estimators are approximately normally distributed by the Central Limit Theorem. However, if the response variables have unequal variances, this unfortunately causes the estimators to be correlated and, therefore, dependent. The use of the data analysis to assess whether the levels of some factors affect the response variability is, itself, a problem of great interest due to its role in robust product design see Chapter 2 for a discussion of available methods and analysis. In the present chapter, we consider situations in which the estimators are independent. [Pg.270]

In the study of nonaqueous electrolytes, the ion-pair effect is a sevae factor affecting ion conduction. The degree of association of salts in nonaqueous solvents (or the solubilizing ability of the different solvents toward the salt) is often estimated by comparing the Walden product, that is, Arf. Justify this method and explain what hypothesis is included and how it holds. (Xu)... [Pg.598]

The project execution plan is intimately related to the cost estimate each one depends on the other and neither can be totally complete without the other. For example, the total number of construction hours may be a determining factor in the contracting strategy, while the contracting strategy will affect productivity, which in turn impacts on the hours. Furthermore, both will influence schedules. Ideally,... [Pg.85]

Price fluctuations, 154 Probability distribution, 745-746 Process design deflnition of 2 development of 2-4, 14-19 Process engineering, deflnition of 2 Process synthesis, 112, 117-125 Product cosf estimation of 192-209 Production costs, factors affecting, 154-157... [Pg.906]

In this paper, the cracking of n-hexane, n-dodecane and n-hexadecane on ZSM-5 zeolites at about atmosphere and temperatures of 260-400°C were studied. The results showed that both mono-molecular cracking and bimolecular reaction (disproportionation) for n-hexane cracking took place. A network for initial reactions was proposed, and the apparent kinetic parameters of the reactions were estimated. An examination for the factors affecting the product destribu-tion of n-hexadecane indicated that hydrogen transfer on the surface of HZSM-5 zeolites plays an important role in cracking reaction. [Pg.627]

Produced from a.tura.1 Ga.s, Cost assessments of methanol produced from natural gas have been performed (13—18). Projections depend on such factors as the estimated costs of the methanol production faciUty, the value of the feedstock, and operating, maintenance, and shipping costs. Estimates vary for each of these factors. Costs also depend on the value of oil. Oil price not only affects the value of natural gas, it also affects the costs of plant components, labor, and shipping. [Pg.423]

Gasohol in the United States. Over 90% of the fuel ethanol in the United States is produced from com. Typically, 0.035 m (1 bushel) of com yields 9.5 L (2.5 gal) of ethanol. Ethanol is produced by either dry or wet milling (87). Selection of the process depends on market demand for the by-products of the two processes. More than two-thirds of the ethanol in the United States is produced by wet milling. Depending on the process used, the full cost of ethanol after by-product credits has been estimated to be between 0.25—0.53/L ( 1—2/gal) for new plants (88). Eeedstock costs are a significant factor in the production of fuel ethanol. A change in com price of 0.29/m ( 1.00/bushel) affects the costs of ethanol by 0.08/L ( 0.30/gal). [Pg.88]

Indeed, the most important factor that affects the future estimates of climate is the (anthropogenic) emissions of greenhouse gases and all kind of aerosols. The amount of these products released into the atmosphere depends upon the socio-economical and technological development of humankind. Thus, different hypotheses about these evolutions are assumed, resulting in several emission scenarios. The scenarios used in the IPCC AR4 derive from a Special Report on Emission Scenarios (SRES) published earlier [2]. All these scenarios can be grouped in four families (storylines) that are named Al, A2, Bl, and B2. [Pg.5]

Bayesian networks for multivariate reasoning about cause and effect within R D with a flow bottleneck model (Fig. 11.6) to help combine scientific and economic aspects of decision making. This model can, where research process decisions affect potential candidate value, further incorporate simple estimation of how the candidate value varies based on the target product profile. Factors such as ease of dosing in this profile can then be causally linked to the relevant predictors within the research process (e.g., bioavailability), to model the value of the predictive methods that might be used and to perform sensitivity analysis of how R D process choices affect the expected added... [Pg.270]

The ET cover cannot be tested at every landfill site so it is necessary to extrapolate the results from sites of known performance to specific landfill sites. The factors that affect the hydrologic design of ET covers encompass several scientific disciplines and there are numerous interactions between factors. As a consequence, a comprehensive computer model is needed to evaluate the ET cover for a site.48 The model should effectively incorporate soil, plant, and climate variables, and include their interactions and the resultant effect on hydrology and water balance. An important function of the model is to simulate the variability of performance in response to climate variability and to evaluate cover response to extreme events. Because the expected life of the cover is decades, possibly centuries, the model should be capable of estimating long-term performance. In addition to a complete water balance, the model should be capable of estimating long-term plant biomass production, need for fertilizer, wind and water erosion, and possible loss of primary plant nutrients from the ecosystem. [Pg.1064]

After the initial volume estimate has been determined, testing of a pilot recovery system should be initiated to evaluate recovery rates. However, factors that significantly affect recovery rates include the areal distribution and geometry of the free-hydrocarbon product plume, type(s) and design of recovery system selected, and the performance and efficiency of the system with time. [Pg.201]


See other pages where Factored estimates Factors affecting productivity is mentioned: [Pg.159]    [Pg.25]    [Pg.221]    [Pg.3]    [Pg.144]    [Pg.311]    [Pg.283]    [Pg.3611]    [Pg.604]    [Pg.324]    [Pg.370]    [Pg.552]    [Pg.187]    [Pg.322]    [Pg.205]    [Pg.3]    [Pg.169]    [Pg.178]    [Pg.86]    [Pg.441]    [Pg.269]    [Pg.278]    [Pg.393]    [Pg.904]    [Pg.20]    [Pg.311]    [Pg.362]    [Pg.500]    [Pg.286]    [Pg.204]    [Pg.4]    [Pg.20]    [Pg.470]    [Pg.241]    [Pg.7]    [Pg.228]    [Pg.321]    [Pg.666]   


SEARCH



Estimating factored

Factor estimation

Factored estimates

Factors affecting production

Production/productivity factors affecting

© 2024 chempedia.info