Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Erection guidelines

In the McCoy table of recommended concentrations of boiler salines, the guidelines for pressures from 100 to 900 psi apply to conventional field-erected boilers with moderate rates of heat transfer, say, 50,000 Btu/hr/ft2. At high rates characteristic of packaged boilers, large amounts of insoluble material cannot be managed effectively by any dispersant presently available. [Pg.596]

Knowing the total equipment erection hours is not sufficient for accurate construction progress monitoring the total must be broken down into discrete portions related to specific equipment items. Table 19.1 provides guidelines for the allocation of hours to each equipment item. [Pg.273]

European legislation is standardized by a guideline on Integrated Pollution Prevention and Control (IPPC) which restricts and controls emissions produced during the erection of new technical plants and the expansion of existing plants. The guideline will come into effect shortly. [Pg.312]

Nevertheless a concretization of the hazard potential is normally not to be expected, since the design, construction, erection, and operation of the plants are based on the state of technology, respectively safety technology (cf. [2]). Hence, they are supported by a broad base of experience, which, depending on the country, is reflected by the respective laws, rules, and regulations. A good overview of this topic is provided by the Guideline Plant Safety [3]. [Pg.3]

This includes that all relevant legal requirements and guidelines for the design and erection of plants and the manufacturing of apparatuses are observed (cf. [9, 10]). [Pg.191]

The plant is designed, fabricated, erected and operated in such a way that the release of radioactive material to the environment does not exceed the limits and guideline values of... [Pg.87]

Subsequently, check hsts/guidelines were prepared for the selection and procurement. These are based on my own experience of working in maity chemical industries in India and other countries for procurement, erection, commissioning and operation. [Pg.267]

Hsu GL, Brock G, Martinez-Pineiro L et al (1994) Anatomy and strength of the tunica albuginea its relevance to penile prosthesis extrusion. J Urol 151 1205-1208 Kim ED, Blackburn D, McVary KT (1994) Post-radical prostatectomy penile blood flow assessment with color flow Doppler ultrasound. J Urol 152 2276-2279 Wessells H, Lue TF, McAninch JW (1996) Penile length in the flaccid and erect states guidelines for penile augmentation. J Urol 156 995-997... [Pg.16]

This appendix serves as a non-mandatory guideline to assist empioyers in compiying with the formwork requirements in 1926.703(a)(1). Formwork which has been designed, fabricated, erected, braced, supported and maintained in accordance with Sections 6 and 7 of the American Nationai Standard for Construction and Demolition Operations-Concrete and Masonry Work, ANSi A10.9-1983, shaii be deemed to be in compiiance with the provision of 1926.703(a)(1). [Pg.646]

Appendix A to Subpart R of Part 1926—Guidelines for establishing the components of a site-specific erection plan Non-mandatory guidelines for complying with... [Pg.651]

COMPONENTS OF A SITE-SPECIFIC ERECTION PLAN NON-MANDATORY GUIDELINES FOR COMPLYING WITH 1926.752(E). [Pg.669]


See other pages where Erection guidelines is mentioned: [Pg.275]    [Pg.311]    [Pg.275]    [Pg.79]    [Pg.176]    [Pg.1]    [Pg.3]    [Pg.93]    [Pg.660]    [Pg.7]    [Pg.71]    [Pg.657]    [Pg.914]   
See also in sourсe #XX -- [ Pg.387 ]

See also in sourсe #XX -- [ Pg.660 ]




SEARCH



Erection

© 2024 chempedia.info