Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Criticality Bars

Criticality bars shall be used with the K-, L-, and P-Reactor bundling stations during fiid bundling operations. [Pg.126]

The criticality bars are used in the MB to prevent more than four fiiel assemblies fix>m being processed into a fiid bundle, theidty preventing a critical configuration of fuel from occurring. If the criticality bars are not used property while assembling a fuel bundle, the likdihood of criticality occurring is increased. (See Section 7.2.7 for fiirtho discussion of oiticality bars.)... [Pg.203]

The criticality bars are aedited in the analysis of the inadvertent criticality event for redudng the possibility of a critical configuration of fiid fix>m bdng assembled. [Pg.203]

Working fluid Type T critical (°C) P critical (bar) Boiling point (°C) GWP (100 years) ODP Applications... [Pg.250]

Figure 4-12. Vapor-liquid equilibria for ethane-n-heptane at 6.9 bars. Ethane is treated as a condensable component even though its critical temperature is 305.4 K. Figure 4-12. Vapor-liquid equilibria for ethane-n-heptane at 6.9 bars. Ethane is treated as a condensable component even though its critical temperature is 305.4 K.
TC = critical temperature, K PC = critical pressure, bars VC = critical volume, cm /g-vol... [Pg.143]

The average accuracy of the Lee and Kesler model is much better than that of all cubic equations for pressures higher than 40 bar, as well as those around the critical point. [Pg.138]

At low temperatures, using the original function/(T ) could lead to greater error. In Tables 4.11 and 4.12, the results obtained by the Soave method are compared with fitted curves published by the DIPPR for hexane and hexadecane. Note that the differences are less than 5% between the normal boiling point and the critical point but that they are greater at low temperature. The original form of the Soave equation should be used with caution when the vapor pressure of the components is less than 0.1 bar. In these conditions, it leads to underestimating the values for equilibrium coefficients for these components. [Pg.157]

Normal boiling point K Standard specific gravity Molecular weight kg/lunol Liquid viscosity at 100°F mm /s Liquid viscosity at 2iO F mm /s Critical temperature K Critical pressure bar... [Pg.416]

Relationship between confidence intervals and results of a significance test, (a) The shaded area under the normal distribution curves shows the apparent confidence intervals for the sample based on fexp. The solid bars in (b) and (c) show the actual confidence intervals that can be explained by indeterminate error using the critical value of (a,v). In part (b) the null hypothesis is rejected and the alternative hypothesis is accepted. In part (c) the null hypothesis is retained. [Pg.85]

Milling not only provides intimate mixing, but also eliminates variation in ribbon thickness and cmshes lumpy materials, eg, overdried soap, which might impact finished bar texture. Milling is also used for the formation of the proper bar soap crystalline phase, which plays a critical role in both the performance properties of the soap bar and the handling characteristics of the in-process soap. For example, too hot a milling temperature can create sticky soap that is difficult to process further. [Pg.156]

Values extracted and in some cases rounded off from those cited in Rabinovich (ed.), Theimophysical Propeities of Neon, Ai gon, Krypton and Xenon, Standards Press, Moscow, 1976. m = melting point c = critical point. The notation 6.654.-4 signifies 6.654 X 10 . This source contains values for the compressed state up to 1000 bar, etc. This book was published in English translation by Hemisphere, New York 1988 (604 pp.). [Pg.300]

Actual progress made with construction work can be indicated on the bar chart by filhng in the open bars according to the percentage toward completion. Comparison of the actual progress bar for the whole project with the cumulative labor-hour curve indicates whether the job is ahead of schedule or not. If corrective action is required, effort should be concentrated on the key or critical items. [Pg.876]


See other pages where Criticality Bars is mentioned: [Pg.69]    [Pg.165]    [Pg.171]    [Pg.194]    [Pg.213]    [Pg.69]    [Pg.165]    [Pg.171]    [Pg.194]    [Pg.213]    [Pg.132]    [Pg.232]    [Pg.316]    [Pg.89]    [Pg.89]    [Pg.98]    [Pg.127]    [Pg.130]    [Pg.143]    [Pg.516]    [Pg.260]    [Pg.360]    [Pg.395]    [Pg.404]    [Pg.305]    [Pg.313]    [Pg.314]    [Pg.317]    [Pg.329]    [Pg.330]    [Pg.333]    [Pg.342]    [Pg.876]    [Pg.1002]   


SEARCH



Bar

© 2024 chempedia.info