This paper describes the result obtained in a study of AFCEN (French Society for Design and Construction Rules for Nuclear Island Components) in order to characterize dye penetrant product family, based on experimental test methods of french standards NFA 09.520 and NFA 09.521. In particular, sensitivity tests have been carried out on artificial defects, and correlated with tests on real defects. Some tests on penetrant washability have also been performed. The results obtained with these three series of tests show that the choiee of a dye penetrant product family is not without influency on results obtained, and that is not so simple to make the good choice which could, in certain cases, be the less bad compromise. [Pg.621]

Vessel Codes Other Than ASME Different design and construction rules are used in other countries. Chemical engineers concerned with pressure vessels outside the United States must become familiar with local pressure-vessel laws and regulations. Boilers and Pressure Vessels, an international survey of design and approval requirements published by the British Standards Institution, May-lands Avenue, Hemel Hempstead, Hertfordshire, England, in 1975, gives pertinent information for 76 political jurisdic tions. [Pg.1028]

Notice that the construction rules are satisfied. The root loci start (K = 0) at the poles of the system openloop transfer function, s = — 1. There are three loci. The angle of the asymptotes is 180/3 = 60°. [Pg.363]

Consider a real function y = f(x) of a real variable x. By this we mean a mapping of the real number x to a unique real number y, given by the rule /. Furthermore, let us assume it to be continuous. We will introduce the concept of the derivative of f(x) with respect to x in terms of the slope of the tangent line at the point x,f(x)). In order to do this, we need to consider three simple constructive rules using the slope of a straight line as our starting point, and Leibniz rule as our keystone. The slope is calculated as a ratio of two displacements rise over run . Hence, we define the derivative of y with respect to r as a quotient of the two corresponding differentials, denoted by dy (the rise ) and dx (the run ) ... [Pg.109]

A prime application of graphical methods in modern distillation technology is for analyzing the results of computer simulations. Several of the graphical construction rules can be bent in order to benefit from computer accuracy and to reduce effort. Johnson and Morgan (28) described several key considerations their work is expanded here using the author s experience. [Pg.79]

The Cantor set C, as well as the fractal shown in Fig. 2.10, are selfsimilar fractals with simple construction rules. Many fractals encountered in physical and mathematical apphcations are not at all that simple. In order to compute their dimensions, one has to use numerical methods. The following are two frequently employed numerical methods for computing fractal dimensions. [Pg.58]

The way in which the limit curve relates to the polygon, and a lot of interesting properties of the limit curve, depend on the set of rules, and this book is about how one can deduce those properties from the set of rules, and how one can then use that understanding to construct rules which give the properties that one wants. [Pg.221]

Until the early 1970s, there was no hint that proteins might be a set of lawful structures determined by a set of constructional rules, laws of protein-fold form, that determine a finite set of natural conformations. [Pg.262]

The construction rules for the root locus of a closed-loop system can be found in the books by Douglas [Ref. 12], Luyben [Ref. 7], and in the following two classic texts ... [Pg.547]

The spill of a small amount of LH2 is more likely to occur than the release of the complete vessel contents (leak-before-failure construction rule). The conceivable ignition of the flammable gas cloud reveals the actual hazardous potential for the environment. A delayed ignition represents the worst case with a certain chance for deflagration or even detonation, connected with the formation of a blast wave and heat radiation. Corresponding relations connect received radiation dose or pressure impact with the probability for a fatality resulting in certain individual risk levels. [Pg.232]

Another question arising from classical annulene chemistry is whether the porphyrin perimeter can be extended. The construction rules for appropriate systems are simple ... [Pg.3]

Safety improvement, taking into account changes in safety standards and current construction rules ... [Pg.84]

Construction rules define the shape, dimension, position, and relationships of entities. Existing entities are used for the purpose of specification of one or more characteristics of new entities. Construction rules bring new constraints into the model. Modification of the model must not break valid construction rules. [Pg.243]

Geometric construction rules are fixed position, horizontal, vertical, end point, and mid point. In Figure 7-20a choice of four rules is offered by the navigation. One of them should be selected, in contrast to dimensional construction rules. Following this, the straight-line segment can be extended using the rule that its end point will be the mid point of the extended entity. [Pg.245]

Logical construction rules are tangent, parallel, perpendicular, concentric, continuous, coincident, symmetric, intersected, point on element, collinear, connect, and equal (Figure 7-21). [Pg.245]

The area of possible cursor positions is divided into intent zones in the view port. A construction rule is attached to each intent zone. In Figure 7-22 five intent zones are communicated with the engineer, who selects intentionally or intuitively. User-defined intent zones can be applied in certain modeling systems. The actually modified element is often called a rubberband because it can be shaped by a very flexible construction method. [Pg.247]

Figure 7-22 Construction rules as they are recognized by navigation. Figure 7-22 Construction rules as they are recognized by navigation.
Curves are modified to change characteristics, modify shape, trim or extend, smooth, and match with the environment. Construction rules or construction rule related parameters are changed. Line, curve, and compound line related dimensions are modified as for the construction rule related parameters. Construction rules can be deleted, inserted, or suppressed. References are defined to objects. Curves, curve segments, or individual points can be unlinked from references. References can be changed or deleted. [Pg.248]


See other pages where Construction rules is mentioned: [Pg.100]    [Pg.125]    [Pg.218]    [Pg.108]    [Pg.524]    [Pg.687]    [Pg.364]    [Pg.43]    [Pg.290]    [Pg.294]    [Pg.211]    [Pg.290]    [Pg.296]    [Pg.621]    [Pg.202]    [Pg.268]    [Pg.269]    [Pg.704]    [Pg.10]    [Pg.473]    [Pg.243]    [Pg.243]    [Pg.244]    [Pg.246]    [Pg.247]    [Pg.250]   