Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Construction organizations

Source From OECD, Use of Waste Materials and Byproducts in Road Construction, Organization for Economic Co-operation and Development, Paris, 1977. [Pg.172]

The construction organization of piping and pipeline systems is responsible for providing materials, components, and workmanship in compliance with the requirements of this Code and the engineering design. [Pg.14]

The owner s Inspector is responsible to the owner to verify that all required examinations, inspections, and testing are complete. The owner s Inspector verifies that all required certifications and records have been completed. Also, the owner s Inspector is responsible for verification of the construction organization s quality systems program implementation. [Pg.14]

Each construction organization (fabricator and erector) is responsible per ASME BPV Code Section IX. [Pg.40]

By certifying signature, the construction organization accepts responsibility for both the WPS and the... [Pg.42]

The construction organization has at least one currently employed welder or welding operator who, while in its employ, has satisfactorily passed a performance qualification test using the designated WPS. [Pg.42]

The construction organization (manufacturer, fabricator, or erector) shall be responsible for... [Pg.63]

Quality control examinations shall include the requirements of the construction organization s Quality System Program for materials, products, components, workmanship, quality documents, procedures and personnel qualifications, construction, and subcontract services. [Pg.64]

Each construction organization shall be responsible for developing a QSP. The Quality System shall include a quality manual, quality policy and objective, structure of organization, documented procedures, work instructions, a quality plan, and document and data control. [Pg.80]

The quality manual shall be a written document including the scope of the Quality System. Information about the construction organization, such as name, location, and means of communication, shall be included, as well as additional information, such as its line of business and a brief description of its background, history, and size. [Pg.80]

The quality manual shall provide a description of the structure of the construction organization. Responsibility, authority, and interrelation may be indicated by such means as organization charts, flowcharts, and/or job descriptions. These shall be included in the quality manual. [Pg.80]

GR-6.2.2.3 Subcontractor Control. The subcontractor services shall be controlled by the processes of procurement, quality review, and surveillance, including receiving inspection, supported by the proper documentation. The subcontractor shall provide a Quality Control System (manual), documented procedures, and applicable work instructions. The construction organization shall be responsible for approval of all subcontract services. [Pg.81]


See other pages where Construction organizations is mentioned: [Pg.224]    [Pg.7]    [Pg.14]    [Pg.16]    [Pg.22]    [Pg.42]    [Pg.42]    [Pg.42]    [Pg.42]    [Pg.42]    [Pg.42]    [Pg.42]    [Pg.42]    [Pg.42]    [Pg.42]    [Pg.42]    [Pg.42]    [Pg.42]    [Pg.42]    [Pg.43]    [Pg.64]    [Pg.64]    [Pg.64]    [Pg.64]    [Pg.65]    [Pg.65]    [Pg.65]    [Pg.80]    [Pg.80]    [Pg.80]    [Pg.81]    [Pg.81]    [Pg.81]    [Pg.81]    [Pg.82]   
See also in sourсe #XX -- [ Pg.42 , Pg.97 ]




SEARCH



© 2024 chempedia.info