Cleaning and Repair

Before reusing a mold, it should be physically cleaned to remove any grime or protective materials. Buildup on the surface should be cleaned off without damaging the surface of the mold. Location pins must be checked and repaired if needed. Any damage caused during demolding also must be repaired if in a critical area. The repairs must be such that they do not leave any marks on the surface of the part. [Pg.76]


Before carrying out any inspections or maintenance procedures on belt drives, make sure they are not in operation. Equipment operators should electrically isolate the drive system and lock-out and tag the machine that is to undergo maintenance. Once this precaution has been taken, the belts and pulleys can be removed from the machine for inspection, cleaning, and repair. [Pg.973]

Water connections to a shell-and-tube condenser must always be arranged so that the end covers can easily be removed for inspection, cleaning, and repair of the tubes. Heavy end covers require the use of lifting tackle, and supports above the lifting points should be provided on installation to facilitate this work. [Pg.77]

It would take many hours of cleaning and repairing for the young... [Pg.92]

The vendor claims that Houdini is qualified for a number of waste remediation applications. Uses for Houdini include mechanical waste retrieval, hot cell decommissioning, tank decontamination, material containerization, wall scabbling, tank inspection, pipeline cleaning and repair, and ship and barge cleaning. [Pg.904]

All require response, with or without prior vigilance and monitoring, and IT is an important coordinator. Responses to epidemics, in particular, but many disasters, in general, can be divided into primary prevention if warned in time (matters to prevent or limit the damage, e.g., vaccination), secondary prevention (matters to rectify the damage, e.g., as antibiotics), and tertiary prevention (cleaning and repairing afterward, e.g., palliative care and rehabilitation). [Pg.460]

The run began on September 26, 1978 and terminated on November 2, 1978, for a total of 833 onstream hours (35 days). During the run, the scrubber was out of service for 48 hours due to a boiler outage caused by a tube leak, 5 hours for a scheduled inspection, and 8 hours for unscheduled outages to clean and repair the scrubber induced-draft fan damper. Excluding boiler outages and scheduled inspections, Run 932-2A operated with an onstream factor of 99.0 percent. As was typical of all long-term rims, the scrubber was more reliable than the boiler. [Pg.284]

Provide easy access for cleaning and repairing. Maximize capacity and efficiency. [Pg.396]

In exchanger maintenance either the complete unit is removed, cleaned and repaired, or only the tubebundle is removed for cleaning and repair — the shell is cleaned in place. If the complete unit is removed, all piping must be disconnected. If only the tubebun e is removed, only the channel nozzle piping need be disconnected. The piping designer can help maintenance in three ways ... [Pg.246]

The main vanadium exposure risks at the workplace occur during the processes of vanadium extraction and preparation from the minerals and to a greater extent during cleaning and repair of petrol containers and oil-fired boilers. For the biological monitoring... [Pg.527]

Extreme care should be taken to see that all foremen and crews selected to undertake cleaning and repairs are familiar with possible hazards. There must be another person watching from the outside. No tank should be entered unless the precautions previously specified are followed (see ASTM D 4276). Ventilation through special vent openings in the bottom should be continued during cleaning and inspection. Under no circumstances should internal or external welding be performed until it has been determined that there is no solvent or solvent vapors in the tank. [Pg.44]

Guards and guard devices may not provide enough protection for all the operations and activities involved in the use, maintenance, cleaning and repair of machines and tools. Several safeguarding procedures will help prevent accidents from occurring. Remember, procedures do not remove hazards. [Pg.169]

In the basket type evaporator (Figure 11-8), construction and operation is much the same as a standard evaporator except that the downcomer is annular. This construction often is more economical and permits the evaporator to be removed for cleaning and repair. An important feature is the easily installed... [Pg.78]

Lease tanks, oil and gas field erecting, cleaning, and repairing on a contract basis... [Pg.258]

The working environment can be improved in many ways. Space constraints should be removed or reduced. Floors should be regularly cleaned and repaired when damaged. Adequate lighting is essential and working at more than one level should be minimized so that hazardous ladder work is avoided. Attention should be given to the need for suitable temperatures and ventilation in the working area. [Pg.219]

An employer is allowed to choose the cleaning and disinfecting program the best meets the requirements of the standard and the particular circumstances of the workplace. In other words, the employer can have respirators cleaned and repaired in a centralized type operation where respirators are passed out to employees OR the employer may require the respirator user to handle all cleaning and respirator maintenance functions. What ever method the employer chooses, respirator cleaning, disinfection, and repair activities must be performed by employees who are adequately trained in the proper respirator care procedures. [Pg.320]

If tank heaters are employed, mobile maintenance equipment should be located in the mo.st convenient area. Tank maintenance includes. such aaivicies as internal inspection, cleaning, and repairs to internals, roof suppoas, and level instruments. Setting entrances to stairway or ladder areas at grade is the mast convenient choice for operations personnel. It should be noted that. stairways are not recommended for tanks whose diameters are le.s.s than 15 ft 6 in (4.7 m). [Pg.369]


See other pages where Cleaning and Repair is mentioned: [Pg.142]    [Pg.274]    [Pg.358]    [Pg.25]    [Pg.205]    [Pg.76]    [Pg.145]    [Pg.10]    [Pg.35]    [Pg.283]    [Pg.289]    [Pg.289]    [Pg.529]    [Pg.267]    [Pg.73]    [Pg.284]    [Pg.47]    [Pg.263]    [Pg.169]    [Pg.379]    [Pg.237]    [Pg.197]    [Pg.158]    [Pg.174]    [Pg.1069]    [Pg.197]    [Pg.65]    [Pg.166]    [Pg.314]    [Pg.135]    [Pg.54]    [Pg.704]   