Request for quote

Fig. 5.4 I nvestment costs for aikaiine eiectroiysers (caicuiated from requests for quotes from different suppiiers in the year 2002). Fig. 5.4 I nvestment costs for aikaiine eiectroiysers (caicuiated from requests for quotes from different suppiiers in the year 2002).
Some of the manufacturers of alkaline eiectroiysers are listed in Table 5.1. Investment costs and efficiencies as a function of the hydrogen production capacity calculated from requests for quotes from various manufacturers are shown in Figures 5.4 and 5.5, respectively. Investment costs per production capacity are highly dependent on the size of the electrolyser unit, efficiencies are almost the same for all system sizes. [Pg.159]

Order Management and Request for Quotes (RFQs) An oiganization, which is responsible for the first line of attack on responding to RFQs, order chtmges, new orders, new customers, should be able to respond rapidly and accurately to delivery capability and costs. More importantly, the response should be based on the current plant loads and reflects the true deUverable lead times and capabilities. [Pg.968]

Representations, operations, memory aids, and control mechanisms (ROMC), 113, 114 Representativeness heuristic, 2198-2199 Requests for estimate (RFEs), 2299-2300 Requests for proposals (RFPs), 1492 Requests for quotes (RFQs), 968 Requirement document (humem-centered product planning/design), 1307 Requisite variety, law of, 958 Rescheduling, 503... [Pg.2773]

RFQ request for quote RPMP reinforced plastic Marco process... [Pg.611]

Supplier Search Offered by Plastics News and Supply Base Inc., Supplier Search is an interactive, global database designed to help usen find and qualify plastics industry processors and suppliers. Some sections also include detailed Request for Quote forms, http // www.pnsuppliersearch.com... [Pg.658]

In laboratory studies, the order processing process via the electronic supply chain management platform was compared with the traditional order processing in the sector. The results showed for both buyer and seller efficiency improvements for a basic direct order of a required input and a request for quote (RfQ) for a required input (see Calosso et al, 2003). These process types build on the extracted reference processes and are the most common order processing variants in the bottleneck of the agri-food network. [Pg.192]

Q07 Diesel catalyst Request for Quote to suppliers... [Pg.686]

The generic mechanics for writing requests for quotes (RFQs) and purchase orders (POs) for vacuum systems are discussed by 0 Hanlon.f Initial performance tests of a system should be made at the supplier location both with the system empty and with typical production fixturing and substrates in place. The system should be helium leak-checked with particular attention given to internal water lines (pressurize the water lines with helium) and feedthroughs. Final acceptance tests should be performed at the user location after the suppher has completed installation. [Pg.135]

Evaluating the costs of goods is a fundamental business exercise. It is a task that any first year accounting student can complete. Unfortunately, many engineers and designers do not know how to do it. They develop a design, select a material based on an evaluation of some property data, and then send out a request for quote (RFQ) for the parts. Then, when the quotes come back, they are stunned that things cost so much. [Pg.214]

For the buyers of agricultural input, the use of the supply chain management system also showed efficiency gains in order processes, 49% in direct ordering and 26% in the RfQ process. The efficiency gain for buyers compared to the traditional RfQ processes would even more increase with a larger number of input sellers to request a quote from. However, as most buyers in the... [Pg.192]

Time required to respond to a request for a price quote... [Pg.259]

A eopv ol this specification is normally attached to a bid request form, which includes a pressure vessel specification sheet such as the one shown in Figure 12-4, This sheet contains schematic vessel drawings and pertinent specifications and thus defines the vessel in enough detail so the manufacturer can quote a price and so the operator can be sure that all quotes represent comparable quality. The vessel connections (nozzle schedules) are developed from mechanical flow diagrams. It is not necessary for the bidder to know the location of the nozzles to submit a quote or even to order material. [Pg.341]


See other pages where Request for quote is mentioned: [Pg.433]    [Pg.3]    [Pg.82]    [Pg.433]    [Pg.967]    [Pg.2774]    [Pg.219]    [Pg.230]    [Pg.192]    [Pg.194]    [Pg.769]    [Pg.433]    [Pg.3]    [Pg.82]    [Pg.433]    [Pg.967]    [Pg.2774]    [Pg.219]    [Pg.230]    [Pg.192]    [Pg.194]    [Pg.769]    [Pg.28]    [Pg.756]    [Pg.26]    [Pg.285]    [Pg.474]    [Pg.66]    [Pg.12]    [Pg.310]    [Pg.42]    [Pg.506]    [Pg.572]    [Pg.46]    [Pg.189]    [Pg.111]    [Pg.675]    [Pg.214]    [Pg.82]    [Pg.842]    [Pg.135]    [Pg.512]    [Pg.473]    [Pg.76]    [Pg.763]    [Pg.146]    [Pg.109]    [Pg.176]   