Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Proposed Grand Inga electricity corridors highways

The environment impact assessment study of the project has shown that there would be no [Pg.1671]

Criticism, largely from the NGO community (publicized by the International Rivers Network - IRN- and some journalists), raised concerns not only about displaced people, but also about threats to biological diversity posed by the reservoir and unidentified consequences for aquatic ecosystems up- and downstream of the dam. Specific concerns were not raised because environmental assessments had not been implemented in this largely unstudied region. [Pg.1671]

Although this reduced the cost of tiluminum production significantly, aluminum production was stUl expensive because 10-12 kWh was required to produce a single pound (Muller, 1945). [Pg.1676]

To maintain historical continuity, contemporary names will be used throughout, with current [Pg.1676]

(1994). Africa-Europe electrical interconnection and prospects of world-wide interconnections. Minister of electricity and energy, Arab Republic of Egypt, CIGRE Keynote Address, Paris, 28 Aug 1994. Retrieved November 8, 2009, from http //www.nokraschy.net/Africa-Eauope lnterconnection.pdf [Pg.1676]


Fig. 95.5 Proposed Grand Inga electricity corridors ( highways ). (Source Inga Hydroelectric Facility. Energy Information Administration, Department of Energy, USA. http //www. eia.doe.gov/emeu/cabs/inga.html)... Fig. 95.5 Proposed Grand Inga electricity corridors ( highways ). (Source Inga Hydroelectric Facility. Energy Information Administration, Department of Energy, USA. http //www. eia.doe.gov/emeu/cabs/inga.html)...

See other pages where Proposed Grand Inga electricity corridors highways is mentioned: [Pg.1669]   


SEARCH



Grand

Highways

© 2024 chempedia.info