Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Preliminary material balance, preparation

Now you can reconsider the material balance equations by adding those additional factors identified in the previous step. If necessary, estimates of unaccountable losses will have to be calculated. Note that, in the case of a relatively simple manufacturing plant, preparation of a preliminary material-balance system and its refinement (Steps 14 and 15) can usefully be combined. For more-complex P2 assessments, however, two separate steps are likely to be more appropriate. An important rule to remember is that the inputs should ideally equal the outputs - but in practice this will rarely be the case. Some judgment will be required to determine what level of accuracy is acceptable, and we should have an idea as to what the unlikely sources of errors are (e.g., evaporative losses from outside holding ponds may be a materials loss we cannot accurately account for). In the case of high concentrations of hazardous wastes, accurate measurements are needed to develop cost-effective waste-reduction options. It is possible that the material balance for a number of unit operations will need to be repeated. Again, continue to review, refine, and, where necessary, expand your database. The compilation of accurate and comprehensive data is essential for a successful P2 audit and subsequent waste-reduction action plan. Remember - you can t reduce what you don t know is therel... [Pg.378]

Gather all the available information on one of the ethylene processes for which a flow sheet was prepared in the preceding problem and make a preliminary material balance for the production of 50 million lb/yr of ethylene. Assume an operating factor of 90 percent. [Pg.44]

Prepare a preliminary material balance. A material balance is designed to provide better understanding of the inputs and outputs, especially waste, of a unit operahon such that areas where informahon is inaccurate or lacking can be identilied. The inihal balance should be considered as a rough assessment that must be further refined and improved. [Pg.147]

Prepare Flow Diagrwns. A preliminary schematic of the proposed process option being considered b prepared. As ntany variables as possible are specified on the diagram (temperatures, pressures, flows, etc.). Required outlet parities and 1 component recoveries are used to establish material balance constraints where possible. [Pg.872]

Prepare material and energy balances, draw up preliminary flow-sheets, size major equipment items and select materials of construction. [Pg.260]

In an attempt to identify new, biocompatible diphenols for the synthesis of polyiminocarbonates and polycarbonates, we considered derivatives of tyrosine dipeptide as potential monomers. Our experimental rationale was based on the assumption that a diphenol derived from natural amino acids may be less toxic than many of the industrial diphenols. After protection of the amino and carboxylic acid groups, we expected the dipeptide to be chemically equivalent to conventional diphenols. In preliminary studies (14) this hypothesis was confirmed by the successful preparation of poly(Z-Tyr-Tyr-Et iminocarbonate) from the protected tyrosine dipeptide Z-Tyr-Tyr-Et (Figure 3). Unfortunately, poly (Z-Tyr-Tyr-Et iminocarbonate) was an insoluble, nonprocessible material for which no practical applications could be identified. This result illustrated the difficulty of balancing the requirement for biocompatibility with the need to obtain a material with suitable "engineering" properties. [Pg.158]


See other pages where Preliminary material balance, preparation is mentioned: [Pg.16]    [Pg.16]    [Pg.287]    [Pg.106]    [Pg.1908]    [Pg.318]    [Pg.375]    [Pg.48]    [Pg.194]    [Pg.213]   
See also in sourсe #XX -- [ Pg.147 ]




SEARCH



Material balance

Material balance preparation

Material balancing

Material preparation

Preliminary

Preliminary material balance

© 2024 chempedia.info