Plant performance, analysis measurements

Extended Plant-Performance Triangle The historical representation of plant-performance analysis in Fig. 30-1 misses one of the principal a ects identification. Identification establishes troubleshooting hypotheses and measurements that will support the level of confidence required in the resultant model (i.e., which measurements will be most beneficial). Unfortunately, the relative impact of the measurements on the desired end use of the analysis is frequently overlooked. The most important technical step in the analysis procedures is to identify which measurements should be made. This is one of the roles of the plant-performance engineer. Figure 30-3 includes identification in the plant-performance triangle. [Pg.2549]

Unit layout as installed is the next step of preparation. This may take some effort if analysts have not been involvea with the unit prior to the plant-performance analysis. The equipment in the plant should correspond to that shown on the PFDs and P IDs. Wmere differences are found, analysts must seek explanations. While a hne-by-line trace is not required, details of the equipment installation and condition must be understood. It is particularly useful to correlate the sample and measurement locations and the bypasses shown on the P IDs to those ac tuaUy piped in the unit. Gas vents and liquid (particularly water-phase) discharges may have been added to the unit based on operating experience out not shown on the P IDs. While these flows may ultimately be small within the context of plant-performance an ysis, they may have sufficient impact to alter conclusions regarding trace component flows, particularly those that have a tendency to build in a process. [Pg.2553]

These potential sampling problems must be solved in advance of the unit test. The conclusions drawn from any unit test are strongly affected by the accuracy of the sampling methods and the resultant analyses. Methods should be discussed and practiced before the actual unit test. Analysts should use the trial measurements in prehm-inary plant-performance analysis to ensure that the results will be use-bil during the actual unit test. [Pg.2559]

Plant-performance analysis reqmres the proper analysis of limited, uncertain plant measurements to develop a model of plant operations for troubleshooting, design, and control. [Pg.2559]

The purpose of the plant-performance analysis is to operate on the set of measurements obtained, subject to the equipment constraints to troubleshoot to develop models or to estimate values for model parameters. [Pg.2560]

Measurement Selection The identification of which measurements to make is an often overlooked aspect of plant-performance analysis. The end use of the data interpretation must be understood (i.e., the purpose for which the data, the parameters, or the resultant model will be used). For example, building a mathematical model of the process to explore other regions of operation is an end use. Another is to use the data to troubleshoot an operating problem. The level of data accuracy, the amount of data, and the sophistication of the interpretation depends upon the accuracy with which the result of the analysis needs to oe known. Daily measurements to a great extent and special plant measurements to a lesser extent are rarelv planned with the end use in mind. The result is typically too little data of too low accuracy or an inordinate amount with the resultant misuse in resources. [Pg.2560]

This is a formidable analysis problem. The number and impact of uncertainties makes normal plant-performance analysis difficult. Despite their limitations, however, the measurements must be used to understand the internal process. The measurements have limited quality, and they are sparse, suboptimal, and biased. The statistical distributions are unknown. Treatment methods may add bias to the conclusions. The result is the potential for many interpretations to describe the measurements equally well. [Pg.2316]

Because the technical barriers previously outhned increase uncertainty in the data, plant-performance analysts must approach the data analysis with an unprejudiced eye. Significant technical judgment is required to evaluate each measurement and its uncertainty with respec t to the intended purpose, the model development, and the conclusions. If there is any bias on the analysts part, it is likely that this bias will be built into the subsequent model and parameter estimates. Since engineers rely upon the model to extrapolate from current operation, the bias can be amplified and lead to decisions that are inaccurate, unwarranted, and potentially dangerous. [Pg.2550]


See other pages where Plant performance, analysis measurements is mentioned: [Pg.2546]    [Pg.2547]    [Pg.2547]    [Pg.2547]    [Pg.2547]    [Pg.2549]    [Pg.2551]    [Pg.2551]    [Pg.2569]    [Pg.2300]    [Pg.2301]    [Pg.2301]    [Pg.2301]    [Pg.2301]    [Pg.2303]    [Pg.2305]    [Pg.2305]    [Pg.2323]    [Pg.2550]    [Pg.2551]    [Pg.2551]    [Pg.2551]    [Pg.2551]    [Pg.2553]    [Pg.2555]    [Pg.2555]    [Pg.2573]    [Pg.2548]    [Pg.2549]    [Pg.2552]   


SEARCH



Measures performance

Performance measurement

Performance measures measurement

Performance, measuring

Performing measurements

Plant measurements

Plant performance

© 2024 chempedia.info