Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Planned Cable Projects

Various transient studies have been performed on the 400 kV cable that will connect Sicily to Mainland Italy [29,30]. In addition to switching transients, the [Pg.275]

Location Route Length (km) Number of ckts Insulation Planned Operation [Pg.276]

Sicily—Mainland Italy Abu Dhabi Island, UAE [28] 38 2 SCOF 2013 [Pg.276]

Messina strait, Italy Sorgente-Rizziconi 42 2 XLPE 2015 [Pg.276]


Table 3.5 lists planned lengthy 400-kV cable projects that will be operational within a couple of years. There is no mention of planned 500-kV cable projects in any publicly available sources. [Pg.320]

Process performance and commercial status. The Akzo process was investigated on a pilot scale (30 kg/h) with PVC cable and pipe scrap. Some tests with mixed PVC waste were carried out on a larger scale (300 kg/h) with the support of the European Council of Vinyl Manufacturers, giving promising results. At the moment the project is on hold, even though there is a plan to realize an industrial-scale plant, with a capacity of about 50000 t/yr. On the other hand, Akzo Nobel has stopped all activities on HCl recycling from PVC [50]. The process is still at pilot-scale status, so that large uncertainty exists about its technical, enviromnental and economic performance. [Pg.469]


See other pages where Planned Cable Projects is mentioned: [Pg.11]    [Pg.320]    [Pg.275]    [Pg.11]    [Pg.320]    [Pg.275]    [Pg.11]    [Pg.316]    [Pg.317]    [Pg.272]    [Pg.272]    [Pg.50]    [Pg.276]    [Pg.39]    [Pg.27]    [Pg.33]    [Pg.125]    [Pg.262]    [Pg.1005]    [Pg.2356]    [Pg.337]    [Pg.40]    [Pg.111]    [Pg.541]    [Pg.303]    [Pg.203]    [Pg.113]   


SEARCH



Cables

Project plan

Project planning

Studies on Recent and Planned EHV AC Cable Projects

© 2024 chempedia.info