Studies on Recent and Planned EHV AC Cable Projects

Similarly to overhead line projects, switching transients, such as the cable energization, the ground fault and the fault clearing are also studied for EHV [Pg.272]

This section focuses on well-known long cable projects, which normally require shunt compensation, since the TOVs discussed in this section can only be observed with these cables. It therefore includes only cross-bonded land cables and submarine cables. It does not include short cables typically installed inside power stations and substations since power system transients peculiar to cable systems are normally not studied for these short cables. [Pg.273]


See other pages where Studies on Recent and Planned EHV AC Cable Projects is mentioned: [Pg.11]    [Pg.316]    [Pg.272]   


SEARCH



Cables

EHV AC cable projects

Planned Cable Projects

Planned studies

Planning study

Project plan

Project planning

Project study

Recent Cable Projects

Studies project study

Study plans

© 2024 chempedia.info