Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Location drawings

Examine the HOMO-2 forphenylisocyanide. Is it directly involved in any o or K bonds If so, which bonds If not, describe where it is located. Draw a Lewis structure for the molecule which is consistent with your result. [Pg.43]

Draw a line from the back-foot (FBM) of the movable component or MTBM through the front-foot of the movable component toward the vertical line where the stationary coupling is located. Draw a short vertical line at the coupling end of the line. Finish the... [Pg.931]

A total of three readings will be carried out for the particles of 0.5 and 5.0 pm in the test area (stations mentioned in attachment no. 1700.20(C). Readings in the test station will be carried out from area of test station (enclosed sampling location drawing). If the particulate counter is transferred to a higher cleanliness class, it is decontaminated with 70% ethanol. [Pg.693]

Every worksheet should be provided with an identification and a means to correlate it to the node and design conditions it was evaluated against. Locations for date, location, drawing reference, node identification or description, and design parameters should be noted on each worksheet. [Pg.58]

To determine the optimum feed plate location, draw a line from the feed composition on the y = x line, through the intersection of the top/bottom operating lines, to the equilibrium curve. The step straddling the feed line is the correct feed-plate location. [Pg.132]

Location drawings are used in the construction industry to locate sites, structures, buildings, elements, assemblies or components. [Pg.335]

Describe process legends and foundation, elevation, electrical, and equipment location drawings. [Pg.167]

Equipment location drawings—show the exact floor plan location of equipment in... [Pg.168]

Equipment location drawings show the exact floor plan location of equipment in relationship to the plant s physical boundaries. Figure 7-23 illustrates this layout. Location drawings provide benefits similar to those of elevation drawings. The entire P ID provides a three-dimensional look at the unit. [Pg.189]

No work should start until location drawings of the buried cables have been obtained. [Pg.193]

The position of the buried cables shown on the location drawings should be checked with a cable location tester. [Pg.193]


See other pages where Location drawings is mentioned: [Pg.460]    [Pg.324]    [Pg.607]    [Pg.82]    [Pg.335]    [Pg.261]    [Pg.261]    [Pg.337]    [Pg.337]    [Pg.78]    [Pg.78]    [Pg.310]    [Pg.186]    [Pg.189]   
See also in sourсe #XX -- [ Pg.67 ]

See also in sourсe #XX -- [ Pg.310 ]




SEARCH



© 2024 chempedia.info