Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Integrity operator compartment

To protect operators from vehicle rollover injuries, some vehicles have a rollover protection system (ROPS). The concept is the same as that for motor vehicles. The goal is to create a protected compartment surrounding the operator. During an accident it is essential to retain the integrity of the operator compartment. For some vehicles a roUover bar is the ROPS. Other elements of the vehicle stmcture help establish the envelope for the compartment. For other vehicles four... [Pg.204]

The integrity of the operator compartment provides protection from other hazards as well. For example, the operator stands in some industrial trucks. If feet or other parts of the body can extend outside the vehicle, they can be crushed if the vehicle runs into something or passes close to an object, wall or column. Protective enclosures or doors can reduce this hazard. [Pg.204]

Export processes are often more complicated than the expression given in Equation 7, for many chemicals can escape across the air/water interface (volatilize) or, in rapidly depositing environments, be buried for indeterminate periods in deep sediment beds. Still, the majority of environmental models are simply variations on the mass-balance theme expressed by Equation 7. Some codes solve Equation 7 directly for relatively large control volumes, that is, they operate on "compartment" or "box" models of the environment. Models of aquatic systems can also be phrased in terms of continuous space, as opposed to the "compartment" approach of discrete spatial zones. In this case, the partial differential equations (which arise, for example, by taking the limit of Equation 7 as the control volume goes to zero) can be solved by finite difference or finite element numerical integration techniques. [Pg.34]

Very recently, Lazarova and Tonova [53] reported an integrated process for extraction and stripping of a-amylase using RMs in a stirred cell with separated compartments for each process. A comparison between the classical process and the integrated process indicated a 1.27-fold enhancement in the enzyme purification by the latter. This integrated process was operated with 100 ml volume in... [Pg.159]

Figure 18.13 Vacuum electrochemical cell with an integrated drying tube (o) and water-cooled jackets (fl, fZ) from (A) a front view and (B) a top view. Schematic representation of the drying operation is shown in A, B and C. The cell is filled with aluminum oxide and electrolyte solution in A. The solution is transferred into the cell by a 90° rotation in B. After back-rotation, the solution flows into the electrode compartment, passing through the cooled alumina drying tube in C. [From Ref. 2, with permission.]... Figure 18.13 Vacuum electrochemical cell with an integrated drying tube (o) and water-cooled jackets (fl, fZ) from (A) a front view and (B) a top view. Schematic representation of the drying operation is shown in A, B and C. The cell is filled with aluminum oxide and electrolyte solution in A. The solution is transferred into the cell by a 90° rotation in B. After back-rotation, the solution flows into the electrode compartment, passing through the cooled alumina drying tube in C. [From Ref. 2, with permission.]...
A complete U.S. Environmental Protection Agency (EPA) particulate sampling system comprises four major subsystems (1) a Pitot tube probe assembly for temperature and velocity measurements and for sampling, (2) a two-module sampling unit that consists of a separate heated compartment with provision for a filter assembly and a separate ice-bath compartment for the impinger train and bubblers, (3) an operating control unit with a vacuum pump and a standard dry gas meter, and (4) an integrated, modular umbilical cord that connects the sample unit and Pitot tube to the control unit. [Pg.333]

Based on the characteristics of inherent safety of the HTR-10 test reactor, no pressure-containing and leak-tight containment is designed The concrete compartments, which houses the reactor and the steam generator as well as other parts of the primary pressure boundary and which is preferably called as confinement, together with the accident ventilation system, serve as the last barrier to the radioactivity release into the environment During normal operation, the confinement is ventilated to be kept sub-atmospheric When the integrity of the... [Pg.161]

Until recently, reactor design, selection of suitable operating conditions, and scale up were performed using either rules of thumb [80] or different kinds of compartment models [36,81 -83].With the exponential increase in computing power, hard- and software tools became available to successfully implement simulation strategies based on integration of computational fluid dynamics (CFD) and structured biokinetics. [Pg.66]

Tables 7-10 present excess pressure values that are limits for the assured integrity of building structures. However, the ALS may lose its function of a safety barrier at a lower excess pressure due to opening of safety valves in the leaktight compartments, whereupon a radioactive release may occur at upper elevations of the reactor budding. The leaktight compartments and the air space of the PSP may suffer overpressure during a LOCA with failure of the PSP cooling system (loss of ultimate heat sink), when steam condensation in the pool water is less effective at water temperatures exceeding about 85°C. Therefore, either the maximum permissible water temperature (for example <85°C) or the operating pressure difference of the safety valves may be adopted as an acceptance criterion for the PSP. Tables 7-10 present excess pressure values that are limits for the assured integrity of building structures. However, the ALS may lose its function of a safety barrier at a lower excess pressure due to opening of safety valves in the leaktight compartments, whereupon a radioactive release may occur at upper elevations of the reactor budding. The leaktight compartments and the air space of the PSP may suffer overpressure during a LOCA with failure of the PSP cooling system (loss of ultimate heat sink), when steam condensation in the pool water is less effective at water temperatures exceeding about 85°C. Therefore, either the maximum permissible water temperature (for example <85°C) or the operating pressure difference of the safety valves may be adopted as an acceptance criterion for the PSP.

See other pages where Integrity operator compartment is mentioned: [Pg.195]    [Pg.149]    [Pg.410]    [Pg.669]    [Pg.43]    [Pg.19]    [Pg.328]    [Pg.52]    [Pg.32]    [Pg.80]    [Pg.211]    [Pg.180]    [Pg.278]    [Pg.2457]    [Pg.418]    [Pg.197]    [Pg.168]    [Pg.319]    [Pg.211]    [Pg.432]    [Pg.46]    [Pg.241]    [Pg.283]    [Pg.260]    [Pg.836]    [Pg.437]    [Pg.667]    [Pg.728]    [Pg.123]    [Pg.139]    [Pg.1843]    [Pg.817]    [Pg.61]    [Pg.204]    [Pg.563]    [Pg.361]    [Pg.395]    [Pg.511]    [Pg.105]    [Pg.106]    [Pg.618]    [Pg.729]   
See also in sourсe #XX -- [ Pg.204 ]




SEARCH



Integral operation

Integral operator

Integrator operation

© 2024 chempedia.info