Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Dump loads

The determination of the size of the hydrogen equipment for these stations is very important to decrease the total cost and the amount of the dumped load due to technical constraints [44], This determination can be achieved by simulating the operation of the whole system based on real wind data of the site and considering all the possible energy losses that might occur. [Pg.175]

The plant comprised the wind turbine, the electrolyser unit complete with its built-in controllable power supply, battery storage, a DC-DC controllable converter, and two dump loads (0.5 and 2 kW) controlled by two voltage-actuated relays. The auxiliary equipment (electrolyser pumps, valves, control equipment, and water demineralisation unit) for the demonstration plant were supplied by the grid for convenience. [Pg.90]

Wind-powered The electrolyser current is controlled by the DC-DC step-down converter, while the current to the battery storage was not controlled, with the battery acting as an energy buffer, and the dump loads were controlled in order to limit the maximum voltage to the battery to prevent overcharging. [Pg.91]

Ol ns Depropanizer Instability and fluctuations oocuned because of operation below the dumping loads in a section of the cohinm just below the feed. Ensure adequate hydraulics above rmd below alternate feed points. [Pg.616]

Becoming comfortable witfi failure takes a new kind of awareness and sensitivity— it takes intuition. These are not exactly words tiiat inspire investors to dump loads of cash into a fledgling business, nor are they what board manbers are looking for in CEOs. [Pg.105]

Because the ore quaUty is variable, large open-pit mining areas are first identified by general exploration specific mining strips are later identified by further exploration and testing. Surface mining methods are used. The overburden is drilled, blasted, and removed, and the waste from a given strip is dumped into a previously worked-out strip. After removal of the overburden, the exposed caUche is drilled, blasted, and loaded into 80-metric ton tmcks that dehver the ore to a transfer rail station for transportation to the plants. [Pg.194]

The speed control operates the governing valve to maintain steam flow commensurate with load demand while holding speed essentially constant. For sudden load changes there will be a short-time overshoot, and a special case is the instantaneous loss of load, load dump at full load. The usual specification states that the overshoot on load dump must not exceed 9 to 10 percent of rated speed. The settled speed rise will of course be equal to the regulation, 4 or 6 percent for a NEMA Class C or B governor and less than I percent for Class D. [Pg.2499]

The trip valve is provided as a second line of defense in case of overspeed The trip valve is frequently equipped with a trip-actuating solenoid which can be operated by push button, by low od pressure, or by some other process upset. When the speed control functions as described above, the trip will not be actuated by load dump. [Pg.2500]

A dragline at Atlantic Richfield s Black Thunder strip mine in Gillette, Wyoming, loads coal into a dump truck. The coal is transported to cities around the country where it is burned to generate electricity. (Corbis-Bettmannj... [Pg.259]

Dump Point, Plate Activation Point, or Load Point... [Pg.204]

Dumped Packing Ga -Liquid System Below Loading... [Pg.310]

Dump bailing method utilizes a bailing device that contains a measure volume of cement slurry. The bailer is run to the appropriate depth on a wireline and releases its load upon bumping the bottom or a permanent bridge plug set at the desired depth (see Figure 4-408). [Pg.1228]

As with the electrical load profile, it is also necessary to analyze the heat load over the daily and annual cycles. Ideally, the heat load will match the available heat from the electrical generator (however, this is rarely the case). There will be periods when supplementary output will be necessary which can be achieved by, say, supplementary firing the waste heat gases of a gas turbine, or heat output reduction is necessary by the introduction of bypass stacks. For a steam turbine installation bypass pressure-reducing valves will be necessary to supplement steam output, while a dump condenser may be needed at low-process steam demands. The nature of the electrical and heat load will obviously have significant influence in the development of the scheme and scope of equipment. [Pg.188]

The electrical and heat analysis, as discussed in Section 15.3, will show the relationship between power and heat and how this varies over time. It may be necessary to use steam bypass and stations or dump condenser, as discussed in Section 15.2. The uses of dump condensers for meeting part-load requirement is inefficient and should be avoided. It is more acceptable to reduce turbine power output accordingly and import or top-up from an alternative supply. [Pg.193]


See other pages where Dump loads is mentioned: [Pg.170]    [Pg.21]    [Pg.88]    [Pg.91]    [Pg.91]    [Pg.471]    [Pg.170]    [Pg.21]    [Pg.88]    [Pg.91]    [Pg.91]    [Pg.471]    [Pg.18]    [Pg.39]    [Pg.90]    [Pg.343]    [Pg.544]    [Pg.182]    [Pg.24]    [Pg.413]    [Pg.208]    [Pg.1922]    [Pg.2237]    [Pg.2241]    [Pg.264]    [Pg.400]    [Pg.393]    [Pg.248]    [Pg.249]    [Pg.273]    [Pg.567]    [Pg.260]    [Pg.260]    [Pg.234]    [Pg.310]    [Pg.498]    [Pg.498]    [Pg.177]    [Pg.840]   
See also in sourсe #XX -- [ Pg.90 , Pg.91 ]




SEARCH



DUMP

Dumping

Electrical load dump

Load-haul-dumps

© 2024 chempedia.info