Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Component testing

BE-M62 MuHi sensor inspection system for component testing towards more reliable Mr E. Fleuet EOF... [Pg.935]

In order to support the design and fabrication of the prototypical flow train, extensive component testing at the 50 MW level was performed at the CDIF, in addition to testing of electrodes and sidewalls and of coal-fired channels of 20 MW si2e at Textron Defense Systems. [Pg.436]

Figure 2.15(a) shows the relationship between and Cp for the component characteristics analysed. Note, there are six points at q = 9, Cp = 0. The correlation coefficient, r, between two sets of variables is a measure of the degree of (linear) association. A correlation coefficient of 1 indicates that the association is deterministic. A negative value indicates an inverse relationship. The data points have a correlation coefficient, r = —0.984. It is evident that the component manufacturing variability risks analysis is satisfactorily modelling the occurrence of manufacturing variability for the components tested. [Pg.57]

The evaluation of the components of the tinplate container showed that the preferred enamel for irradiation processing was the epoxy phenolic the preferred end-sealing compound was the blend of cured and uncured isobutylene—isoprene copolymer. Component testing of tinplate and solder for possible changes in mechanical properties, microstructure, and corrosion resistance indicated that the radiation caused... [Pg.40]

The liquid desiccant cooling system is designed, built and installed. A series of problems occurred and caused a significant time delay. Due to that time delay the demonstration project has to be stopped and no reliable data of the component test and the system operation could have been recorded. [Pg.443]

A sequential procedure was further developed by Tong and Crowe (1996) by applying sequential analysis of the principal component test using the sequential probability ratio test (SPRT). Dunia et al. (1996) also used PCA for sensor fault identification via reconstruction. In that paper it was assumed that one sensor had failed and the remaining sensors are used for reconstruction. Furthermore, the transient behavior of a number of sensor faults in various types of residuals is analyzed, and a sensor validity index is suggested, determining the status of each sensor. [Pg.240]

Sprinkler Flushing Hydrostatic test Installation verification Component tests 13... [Pg.333]

A statement of the results of tests and how the results compare with established standards of identity, strength, quality, and purity for the component tested. [Pg.22]

To establish safety and to ensure consistency, the complete chemical composition should be provided for every material used in the manufacture of a packaging component. Test results from appropriate qualification and characterization tests should be provided. Adequate information regarding the tests, methods, acceptance criteria, reference standards, and validation information should be also provided. [Pg.21]

Dne after another, the components Tests Viscosity (mPas) 330 Cloud point <-5C of B are added to A. [Pg.22]

IEC 61340-3-1,2002. Electrostatics - Method for simulation of electrostatic effects-Human body model - Component testing. [Pg.273]

Refs l)Anon, "Artillery Ammunition Component Tests, General , OPM8-10 (1947)... [Pg.247]

E Control of components, containers Incoming component testing proce-... [Pg.19]

I Laboratory controls Analytical methods, testing for release component testing and stability testing... [Pg.19]

Purge line A with water and line B with MeOH. Dial-a-mix 70% MeOH and equilibrate the C18 column at l.OmL/min. When stable, inject 15pL of the seven-component test mixture and annotate the chromatogram s start. Run an isocratic chromatogram. [Pg.231]

Put acetonitrile in the B reservoir. Purge the pump inlet line with acetonitrile. Dial-a-mix 60% acetonitrile/water. Reconnect the C18 column at O.lmL/min. Increase the flow to l.OmL/min and equilibrate the column. Inject 15 pL of the seven-component test mixture. Annotate and run the chromatogram. [Pg.232]

Proton Exchange Membrane Technology Fuel Cell Components Testing Equipment Software... [Pg.241]

To design, develop, constmct and operate a HyS pilot plant (HySPP) in which all the different technologies are integrated. The HySPP will enable component testing as well as integrated system testing, optimisation and control refinement. [Pg.209]


See other pages where Component testing is mentioned: [Pg.299]    [Pg.436]    [Pg.251]    [Pg.149]    [Pg.29]    [Pg.538]    [Pg.38]    [Pg.438]    [Pg.142]    [Pg.143]    [Pg.125]    [Pg.124]    [Pg.288]    [Pg.28]    [Pg.251]    [Pg.174]    [Pg.492]    [Pg.473]    [Pg.216]    [Pg.492]    [Pg.374]    [Pg.27]    [Pg.379]    [Pg.143]    [Pg.229]    [Pg.231]    [Pg.353]    [Pg.104]    [Pg.156]    [Pg.52]    [Pg.54]    [Pg.310]   


SEARCH



© 2024 chempedia.info