Change control board

Modification instructions should be produced after approval for the change has been granted and should be submitted to the change control board or design authority for approval before release. [Pg.273]

The evaluation may need to be carried out by a review team, by subcontractors, or by the original proposer however, regardless of who carries out the evaluation, the results should be presented to the change control board for a decision. During development there are two decisions the board will need to make ... [Pg.274]

During production the change control board will need to make four decisions ... [Pg.275]

Set up a design change control board to review, evaluate, and approve or reject design changes. [Pg.277]

CBs, see Common bases CBS (cost breakdown structure), 1273 CBT, see Computer-based training CCB (change control board), 1276 CCDs (charge-coupled devices), 1904 C charts, 1844, 1847-1851, 1874-1875 CCSO, 966... [Pg.2708]

Change control board (CCB), 1276 Change leadership, 14—15 Change management, automation of, 1259 Channels, see Marketing channels Character design, computer, 1196-1197 Charge-coupled devices (CCDs), 1904 Charismatic leadership, see Transformational leadership... [Pg.2708]

See Change Control Board (CCB) and Configuration Management (CM) for additional information. [Pg.124]

In an August 30, 1990 letter to DOE (Reference 3), WSRC listed those specific actions the Electrical Implementation Task Force determined to be needed to implement each of the recommendations from the ISA of the electric power system (References 1 and 4). On September 4, 1990, the WSRC Change Control Board approved Schedule Change Notice 0322 (SCN-0322), which defines the approved scope, schedule, and deliverables for the implementation of the recommendations from the ISA of the electric power system. The approval of this SCN paves the way for entry of these actions into the ROMP system. The staff views ROMP SCN-0322 as an overall summary of the implementation actions. [Pg.257]

Yet in the control room the switches may now be configured in D-A-B-C sequence because there was no room on the control board for the new switch to be added after the C switch, but there was room to add it before the A switch. In an emergency, the operator is likely to mistakenly flip the D switch when really trying to flip the A switch. This ergonomic trap proliferates as time goes on and changes are made without consideration for operator habits, tendencies, and normally expected actions. [Pg.88]

Thickness changes in a six-cycle water-soaking/ovendrying test for an acetylated aspen flakeboard are shown in Figure 4 ( ). Control boards swelled more than 70 percent in thickness during the six cycles, compared with less than I5 percent for a board made from acetylated flakes. Acetylation greatly reduced both irreversible and reversible swelling. [Pg.248]

Figure 5 (2J) shows changes in thickness of aspen flakeboards made from control and acetylated flakes using a phenolic adhesive at different relative humidities. After four cycles of 30 to 90 percent RH, control boards swelled 30 percent in thickness, while acetylated boards at 17 9 WPG swelled about 5 percent. [Pg.248]

Surface smoothness or its inverse property, grain raising, was not quantified. Qualitatively this property was changed only slightly in the instance of the HDA experimental boards after the one-hour boil test whereas, that of the PF control boards had substantially deteriorated. [Pg.184]

There have been several studies on the changes in mechanical properties of fiberboards made from chemically modified wood fiber. Hardboards made from control and acetylated hemlock fiber using 7% phenyl-formaldehyde adhesive were tested. In static bending, MOR was reduced by 23% and MOE reduced by 16% in acetylated boards as compared to control boards [38]. Tensile strength parallel to the surface was reduced by 5% but there was no... [Pg.306]

At 16 15, abrupt increase of indications of all IVA devices installed on the outlet of the SG-5 all sections started (it should be taken into account that the period of sodium flow through the circuit is about 2 minutes). However indications of ITI, ISHIT and KAV-7 devices did not change, causing some doubt with respect to the IVA s indication growth, and the latter was explained by erroneous actions of I C man sent to the local control board. [Pg.130]

Data pertinent to configuration management are readily accessible throughout the system Ufe cycle. The enterprise establishes and maintains configuration control boards to process, review, and approve rargineer-ing changes to end items. [Pg.60]

The enterprise updates specifications and configuration baselines to reflect all changes approved by the configuration control board. The original configuration baseline, with approved changes, provides the basis for... [Pg.62]

To comply with instructions given by statutory authorities like boiler inspector, electrical inspector, factoiy inspector and pollution control board inspector for changing old machines... [Pg.16]

Simply put, instead of turning handwheels as is required by conventional machines the CNC machine control unit (MCU) sends a motion signal via a controller board to a servo motor attached to each machine axis. This causes the servo motor to rotate a ballscrew attached to the table, cross-slide or column, causing it to move. The actual position of the axis is continuously monitored and compared to the commanded position with feedback from a transmitter attached to the ballscrew. The ballscrews have almost no backlash, so when the servo reverses direction there is almost no lag between a commanded reversing motion and corresponding change in slide direction. [Pg.173]

The Change Ad isor> Board is the Logica forum that will re ie v infonnation presented to them in support of Change Control Notes and approve, reject or hold in abe ance for further information as the see fit. The CAB will work to msure that where the change has dependencies on other projects ser ices that these will recei% e due attention so as not to hold up the re ie v or implementation of the change. [Pg.100]


See other pages where Change control board is mentioned: [Pg.244]    [Pg.273]    [Pg.274]    [Pg.275]    [Pg.1276]    [Pg.99]    [Pg.38]    [Pg.53]    [Pg.53]    [Pg.376]    [Pg.488]    [Pg.501]    [Pg.46]    [Pg.244]    [Pg.273]    [Pg.274]    [Pg.275]    [Pg.1276]    [Pg.99]    [Pg.38]    [Pg.53]    [Pg.53]    [Pg.376]    [Pg.488]    [Pg.501]    [Pg.46]    [Pg.244]    [Pg.270]    [Pg.262]    [Pg.49]    [Pg.257]    [Pg.3064]    [Pg.429]    [Pg.533]    [Pg.163]    [Pg.164]    [Pg.320]    [Pg.176]    [Pg.249]    [Pg.44]    [Pg.2003]    [Pg.43]    [Pg.55]   
See also in sourсe #XX -- [ Pg.244 , Pg.270 , Pg.273 ]

See also in sourсe #XX -- [ Pg.53 ]




SEARCH



© 2024 chempedia.info