Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Verification deliverables

From the guiding standards we can extract verification deliverables as follows ... [Pg.224]

The system wide verification deliverables from ARP4754A (Appendix A) can be extracted into Table 9.13. [Pg.224]

A statement of work which you require the subcontractor to perform - it might be design, development, management, or verification work and will include a list of required deliverables such as project plans, quality plans, production plans, drawings, test data, etc. You need to be clear as to the interfaces both organizationally and technically (see Part 2 Chapter 4). [Pg.319]

Verification—The activity of demonstrating hy analysis or test, that, for the specific inputs, the deliverables meet, in all respects, the objectives and requirements set forth by the functional specificadon. [Pg.442]

The requirements specification deliverable is tested in an operating environment during the PQ and must include the verification of the procedural controls associated with the system, as identified in the requirements specification deliverable. [Pg.208]

The model encourages verification of all deliverables, not just the system. [Pg.104]

With reference to Table 9.13, the following deliverables are required as evidence of verification accomplishment at each level of system integration (refer to Fig. 1.3) ... [Pg.259]

If good requirements and specifications have been written, verification and validation are straightforward. Deliverables of V V should include ... [Pg.32]

The verification portion includes all the specific requirements (all the shall statements) from the standard. Whoever has the review responsibility for any lifecycle activity deliverable should consider developing a verification list that addresses relevant requirements from the standard. [Pg.56]

Table C.3 — Overview of activities, including verification, input information, output deliverables, and performance monitoring associated with ANSI/ISA-84.00.01-2004-1... Table C.3 — Overview of activities, including verification, input information, output deliverables, and performance monitoring associated with ANSI/ISA-84.00.01-2004-1...
General requirement Existence of software (S/W) development plan including Procurement, development, integration, verification, validation and modification activities Rev number, configuration management, deliverables Responsible persons Evidence of reviews ... [Pg.158]

Plans for control and verification activities, deliverables included. [Pg.321]


See other pages where Verification deliverables is mentioned: [Pg.225]    [Pg.226]    [Pg.232]    [Pg.225]    [Pg.226]    [Pg.232]    [Pg.247]    [Pg.406]    [Pg.427]    [Pg.48]    [Pg.56]   
See also in sourсe #XX -- [ Pg.225 ]




SEARCH



Deliverables

Verification

© 2024 chempedia.info