Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Parts list

Part AM This part lists permitted individual constnic tion materials, apphcable specifications, special requirements, design stress-intensity vafues, and other property information. Of particular importance are the ultrasonic-test and tou ness requirements. Among the properties for which data are included are thermal conduc tivity and diffusivity, coefficient of theiTnal expansion, modulus of elasticity, and yield strength. The design stress-intensity values include a safety factor of 3 on ultimate strength at temperature or 1.5 on yield strength at temperature. [Pg.1025]

B. Use name, number, or other designation in parts list, as well as naming part. [Pg.659]

Information on maintenance is available from a large number of sources. The initial one is that of the manufac-turer/supplier for new plant and equipment. Where this plant and equipment forms a part of a process, the party responsible for the overall design must prepare the appropriate operation and maintenance and instmctions. These should be supported by technical manuals, which should include spare parts lists, control measures, and, where possible, faultfinding charts. [Pg.792]

Gerstein, M., and Hegyi, H. (1998). Comparing genomes in terms of protein structure surveys of a finite parts list. FEMS Microbiol. Rev. 22, 277-304. [Pg.272]

Cells have many parts, each with a different function. Some of these parts, called organelles, are specialized structures that perform certain tasks within the cell. Human cells contain the following major parts, listed in alphabetical order ... [Pg.11]

The vendor shall submit complete parts lists for all equipment and accessories supplied. The lists shall inelude manufaeturer s unique part numbers, materials of eonstrae-tion, and delivery times. Materials shall be identified as specified in 2.11.1.2. Eaeh part shall be eompletely identified and shown on eross-sectional or assembly-type drawings so that the purchaser may determine the interchangeability of these parts with other equipment. Parts that have been modified from standard dimensions and/or finish to satisfy specific performance requirements shall be imiquely identified by part munber for interchangeability and future duplication pmposes. Standard purchased items shall be identified by the original manufacturer s name and part number. [Pg.70]

The vendor shall indicate on the preceding parts lists which parts are recommended spares for start-up and normal maintenance as referenced in 6.2.3, Item f (Table 6-1). The vendor shall forward the lists to the purchaser promptly after receipt of the reviewed drawings and in time to permit order and delivery of the parts before field start-up. The transmittal letter shall be identified with the data specified in 6.1.2. [Pg.70]

Good donor cars. The Camaro has a computer on board, I have one with a v6 vortec. The Mustang will be the better bet as the car won t need to be modified. Just print off the diagram and use the parts listed. Don t change the fuel tank or exhaust at this point in time. Just hook a hose to the fuel pump from a separate tank of water, you won t have to mount anything on the car either. [Pg.12]

MueUer, M., Martens, L. and Apweiler, R (2007) Annotating the Human Proteome Beyond Establishing a Parts list. Biochim Biophys Acta (BBA) -Proteins Proteomics, 1774,175. [Pg.77]

When you press the ENTER key, only one part should be displayed in the part list ... [Pg.567]

The part listed in the database is part number pl.5ketr-nd, which is a 1.5k resistor. In the schematic, the value is 1.8k, so the schematic information is inconsistent with the database information. If we create a BOM with this schematic, it will be incorrect. Capture CIS provides a facility for detecting these inconsistencies. [Pg.568]

List of change parts List of spare parts Calibration... [Pg.672]

RECOMMENDED SPARE PARTS LIST ANOCOSTOF EACH ITEM... [Pg.697]

One lining and two rubber rings for the lining are added to the spare parts listed on page- 790. [Pg.32]

Each piece of packaging line equipment must be examined for conformance to the specifications, materials of construction, and drawings. For each piece a utility survey must be performed to determine if all the requirements for the equipment have been met and whether or not each is properly installed. There should be documentation of the equipment characteristics, maintenance procedures, repair, parts list, and calibration. [Pg.647]

Critical spare parts list and change parts Utilities connections verfication... [Pg.648]

The present survey is divided into three sections. The first reviews only die completed syntheses, formal or otherwise, of Amaryllidaceae alkaloids reported during the decade 1968 to 1998. Interesting, but as yet unsuccessful synthetic approaches are only referred to when appropriate. The second part lists new alkaloids isolated during the same period, followed by a brief third section dealing with the biological activity associated with some of them. [Pg.434]


See other pages where Parts list is mentioned: [Pg.112]    [Pg.316]    [Pg.539]    [Pg.168]    [Pg.168]    [Pg.516]    [Pg.518]    [Pg.434]    [Pg.300]    [Pg.303]    [Pg.32]    [Pg.319]    [Pg.70]    [Pg.163]    [Pg.181]    [Pg.19]    [Pg.61]    [Pg.139]    [Pg.104]    [Pg.170]    [Pg.351]    [Pg.559]    [Pg.344]    [Pg.57]    [Pg.182]    [Pg.496]    [Pg.24]   
See also in sourсe #XX -- [ Pg.332 ]




SEARCH



© 2024 chempedia.info