Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Maximum allowable area

Furthermore, the average area per shell (Anetwork, 1-2/ Nshell) can also be considered at the targeting stage. If this is greater than the maximum allowable area per shell, AsHELL.max, then the shells target needs to be increased to... [Pg.392]

The maximum allowable area must be evaluated based upon the correct occupancy and constmction type in conjunction with UBC Table 5-B and UBC Sections 504 and 505. The areas specified in Table No. 5-B and UBC Section 504.2 may be tripled in one-story buildings and doubled in buildings of more than one story if the building is provided with an approved automatic sprinkler system throughout. The basic allowable area may be doubled for multiple story buildings and may be increased for side yards (accessible to the fire department) where they exceed 20 feet. [Pg.440]

Division of an existing structure into separate buildings (if required to comply with the maximum allowable area limitations) may be accomplished by die construction of area separation walls (UBC Section 504.6). (See Fig. 2.)... [Pg.441]

Cell Assembly. The methods for cell assembly, starting with the processed plaques depend on whether the cells are to be vented or sealed. For vented cells, processed plaques are usually compressed to 85 —90% of their processed thickness allowing sufficient porosity for electrolyte retention and strengthening the plate stmcture. For sealed cells, sizing of the negative plaques is usually avoided because maximum surface area is important to oxygen recombination. [Pg.548]

Figure 14-25 or Eq. (14-92) may be used for sieve plates, valve plates, or bubble-cap plates. The value of the flooding vapor velocity must be considered as approximate, and prudent designs call for approaches to flooding of 75 to 85 percent. The value of the capacity parameter (ordinate term in Fig. 14-25) may be used to calculate the maximum allowable vapor velocity through the net area of the plate ... [Pg.1372]

Generally the maximum allowable velocities are lower under conditions of pressure, and higher under conditions of vacuum. The limits and ranges of each area being determined by the relative operating densities of the vapor and liquid, the nature of the entrainment, and the degree of separation required. [Pg.250]

Safety valves are matched to a boiler s particular maximum allowable working pressure (MAWP), and a boiler failure may result if this pressure is greatly exceeded. Typically, boilers having more than 500 ft2 of surface area or exceeding more than 500 kW input are required to have two safety valves. [Pg.79]

The principal factor that determines the column diameter is the vapour flow-rate. The vapour velocity must be below that which would cause excessive liquid entrainment or a high-pressure drop. The equation given below, which is based on the well-known Souders and Brown equation, Lowenstein (1961), can be used to estimate the maximum allowable superficial vapour velocity, and hence the column area and diameter,... [Pg.557]

Estimate the heat transfer area, using the maximum allowable heat flux. Take as 39,700 W/m2 for vertical and 47,300 W/m2 for horizontal reboilers. [Pg.744]

The conditions for propagating brush discharges may be quantified in terms of the thickness of the insulating layer d,ayer and the maximum allowable capacitive energy per unit area ue (in J/nr) where... [Pg.848]

L = maximum allowable longitudinal extent of ground area, in. [Pg.71]

Maximum allowable emission concentration in populated areas of former Soviet Union No observable effect level... [Pg.768]

Qrc] = the number of bed volumes per hour, h-1 Mmax = the maximum allowable linear velocity, m/h A = the bed cross-sectional area, m2... [Pg.537]


See other pages where Maximum allowable area is mentioned: [Pg.228]    [Pg.442]    [Pg.442]    [Pg.675]    [Pg.675]    [Pg.1155]    [Pg.1155]    [Pg.228]    [Pg.442]    [Pg.442]    [Pg.675]    [Pg.675]    [Pg.1155]    [Pg.1155]    [Pg.66]    [Pg.49]    [Pg.50]    [Pg.1435]    [Pg.1882]    [Pg.406]    [Pg.86]    [Pg.271]    [Pg.87]    [Pg.317]    [Pg.342]    [Pg.196]    [Pg.191]    [Pg.234]    [Pg.110]    [Pg.200]    [Pg.557]    [Pg.865]    [Pg.54]    [Pg.63]    [Pg.429]    [Pg.230]    [Pg.64]    [Pg.52]    [Pg.209]    [Pg.71]    [Pg.168]    [Pg.157]    [Pg.94]   
See also in sourсe #XX -- [ Pg.440 ]




SEARCH



Allowable area

Allowables

Allowances

© 2024 chempedia.info