Ensure safe system of work provided, taking account of prevailing conditions including weather, traffic and existing structures. Provide suitable PPE as required and ensure its correct use. Inspect excavations daily or before each shift. Record thorough examination. Ensure personnel selected are capable, fit and experienced unless under direct supervision. COSHH assessments are to be made of substances likely to be found or produced during the work. [Pg.158]

Remediation activities at American Thermostat included the excavation and thermal treatment of over 13,000 cubic yards of soil and sediments contaminated primarily with perchloroethylene, trichloroethylene, and solvents. The soil was excavated and treated using a thermal treatment unit called the low-temperature enhanced volatilization facility (LTEVF). The performance test for the site s thermal unit had just been completed at the time of the inspection, so there was limited activity. [Pg.179]

Installing any of these crash beam barriers involves the excavation of a pit approximately forty-eight inches deep for both the hinge and the receiver footings. Due to the depth of excavation, the site should be inspected for underground utilities before digging begins. Table 9.2 lists the pros and cons of crash beams. [Pg.163]

Excavation of hellholes and visual inspection at locations deemed problematic as a result of soil aggressiveness, and the interpretation of the test results. [Pg.55]

Open hole inspection- When an engineer (or municipal inspector) inspects the open excavation and examines the earth to determine the type of foundation (caisson, footer, wall on ground, etc.) that should be installed in the hole. [Pg.266]

Half-cell potentials cannot be correlated directly with the corrosion rate of the rebars. By excavating suitable inspection windows in the transition areas between very negative (active) and passive regions, the intensity of corrosion attack can be determined, and a correlation between potential and corrosion state can be established. This is valid only for the specific structure investigated. [Pg.283]

A.2. Before the construction of a nuclear facility is begun, the regulatory body should monitor as appropriate, by means of its inspection programme, site preparation activities undertaken by the operator, including verification of site characteristics and authorized excavation and earthwork. [Pg.39]

T. Paine will inspect ground conditions on a daily basis and after any rain, paying close attention to areas around nearby excavations. [Pg.167]

The location site of the mosque is within the Kenny Hill Formation (quartzite and phyllite) of Kuala Lumpur, Malaysia. Inspection trenches excavated for examining the existing foundation and deep soil investigation boreholes revealed that the top 5 m was loose silty sand underlain by 3 m of medium dense sand. Below this were residual soils followed by weathered quartzite and phyllite of the Kenny Hill Formation. [Pg.203]

Rock passes are used in a variety of underground mining operations. Flow of material from rock passes is usually controlled by means of radial doors mounted in structures referred to as boxfronts. Specification of the design loads for boxfronts is complicated by many factors, including the wide variability of material handled, difficulty with achieving excavation accuracy, access logistics which compromise inspections and the desire to standardize and economize components. [Pg.579]

Excavations and protective system inspected by designated competent person daily,... [Pg.258]

These inspections do not have to be recorded but it is prudent to do so. However, the following inspections of all excavations must be recorded on Form 91 ... [Pg.215]

X 2.3 m. Inspection was conducted in pile No. 9 (P9) of 1.2 m diameter and 28.9 m length located at a comer of the footing as illustrated in Fig. 14.2. Induced AE waves due to shaking a heavily machinery were directly monitored by AE sensors placed on internal wall of a borehole P9 excavated in the pile. AE activity was also indirectly monitored by AE sensors set in a monitoring borehole B1 excavated. It is noted that the distance between the center of the pile and that of the well was 1.9 m. [Pg.344]

According to OSHA, your company competent person must inspect all excavations each day for evidence of a situation that could result in ... [Pg.261]

Specific excavation requirements—to include surface hazards, underground utilities, getting in and out of the excavation, traffic hazards, hazardous atmospheres, emergency rescue, inspections, and fall protection. [Pg.262]


See other pages where Inspections excavations is mentioned: [Pg.272]    [Pg.272]    [Pg.612]    [Pg.297]    [Pg.164]    [Pg.868]    [Pg.50]    [Pg.490]    [Pg.280]    [Pg.169]    [Pg.322]    [Pg.30]    [Pg.209]    [Pg.61]    [Pg.280]    [Pg.178]    [Pg.69]    [Pg.7]    [Pg.85]    [Pg.637]    [Pg.290]    [Pg.135]    [Pg.141]    [Pg.287]    [Pg.722]    [Pg.998]    [Pg.214]    [Pg.125]    [Pg.126]    [Pg.228]    [Pg.20]    [Pg.62]    [Pg.259]   