Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Drilling Processes Drill room

Keeping a consistent room temperature is essential for maintaining accurate positioning of the machine. A stable temperature throughout the PCB process assists in decreasing the amount of potential growth and contraction of the substrate materials. The drill room should be kept at a constant temperature and humidity, typically 72 2°F (22 +1.1°C) and 45 to 60 percent humidity. [Pg.570]

In the case of an external disaster, hospitals should have the ability to discharge any patient who does not immediately require hospital care (e.g., elective preoperative patients) to make room for patients from an MCI. This is a complicated process and needs to be drilled regularly. Surge capacity should be calculated as part of the planning process and includes not only physical beds but staff and supplies (e.g., ventilators and pain medi-... [Pg.222]

This item is also located in the process room. The explosive containment chamber (ECC) is where the munitions will be either cut or drilled. In the event of an accidental detonation during the cutting or drilling, the ECC is designed to withstand a blast of up to 13 pounds of TNT without a vapor release but is expected to be used to destroy projectiles not exceeding 5 pounds of TNT equivalent. [Pg.103]

Good knowledge of drills and procedures Ability to operate control equipment accurately An understanding of the theory and application of the control process An understanding of the safety aspects of control room operations The ability to make appropriate decisions The ability to assess situations accurately The ability to deal with stress and pressure... [Pg.13]

The clamp is manufactured via Vacuum Bag Resin Infusion, a process that is similar to Vacuum Assisted Resin Transfer Moulding, at room temperature. Machining and drilling are required to form the necessary grooves that house the seals and the holes for the fasteners, respectively. Alternative manufacturing approaches may be used, such as wet lay-up and resin transfer moulding. A typical ProAssure Clamp is shown in Figure 12.2. [Pg.241]


See other pages where Drilling Processes Drill room is mentioned: [Pg.893]    [Pg.182]    [Pg.196]    [Pg.182]    [Pg.23]    [Pg.22]    [Pg.182]    [Pg.737]    [Pg.36]    [Pg.104]    [Pg.252]    [Pg.69]    [Pg.160]    [Pg.337]    [Pg.145]    [Pg.168]    [Pg.1166]    [Pg.1527]    [Pg.303]    [Pg.102]    [Pg.189]    [Pg.110]    [Pg.47]    [Pg.305]    [Pg.137]    [Pg.139]    [Pg.245]    [Pg.155]   
See also in sourсe #XX -- [ Pg.6 , Pg.25 ]




SEARCH



Processing drilling

© 2024 chempedia.info