Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Auxiliary provisions

The annual corrosion rate of steel has little or no bearing on paint selection the main concern is with the service life of the paint system in destructive exposure and a possible occurrence of rust-creep. Neither does it affect the selection of surface preparation nor the selection of a cathodic protection system. The ultimate paint system should be restricted, for economic reasons, to aggressive areas and less expensive systems used for less destructive exposure. In the economic evaluation of painting preservation the cost of materials is not indicative on its own - the cost of labour (approximately 80%), auxiliary provisions (scaffolding, plant, ventilation, drying, lighting, and cleaning), accommodation, and transport of personnel must be included. [Pg.380]

The supply system for the power plant auxiliaries, including the provision of supplies to any important drives and the provision of standby supply systems. The protection and synchronizing schemes applicable to the generator circuit. [Pg.190]

In order to operate the prime movers described in the previous sections it is necessary to provide auxiliary equipment for the start-up, steady operation and shutdown of the basic equipment as well as for monitoring and controlling its performance. The need also arises for the maintenance of the plant that invokes the provision of cranage and lay-down areas in the engine room. The following describes these features for the various types of prime movers. The driven machines (i.e. the electrical generators) are also reviewed in detail so that the complete picture of industrial generating stations can be obtained. [Pg.196]

Alternatively, the option that a steam plant offers of the provision of process steam coupled with power generation may be the key element in the selection of generating plant. The turbo-generators and their auxiliaries for use in such applications tend therefore to be relatively unsophisticated, with no feed heating, except for probably the provision of a deaerator. Again, in the turbine itself, machine efficiency tends to be sacrificed for robustness and the ability to accommodate varying load conditions. [Pg.202]

Two types of continuous flow solid oxide cell reactors are typically used in electrochemical promotion experiments. The single chamber reactor depicted in Fig. B.l is made of a quartz tube closed at one end. The open end of the tube is mounted on a stainless steel cap, which has provisions for the introduction of reactants and removal of products as well as for the insertion of a thermocouple and connecting wires to the electrodes of the cell. A solid electrolyte disk, with three porous electrodes deposited on it, is appropriately clamped inside the reactor. Au wires are normally used to connect the catalyst-working electrode as well as the two Au auxiliary electrodes with the external circuit. These wires are mechanically pressed onto the corresponding electrodes, using an appropriate ceramic holder. A thermocouple, inserted in a closed-end quartz tube is used to measure the temperature of the solid electrolyte pellet. [Pg.552]

Provision shall be made to ensure complete venting of the inner assembly within the seal chamber or associated auxiliary process piping. [Pg.65]

Note that Eq. (5.99) does not contain parameters related to the microelectrode itself. Therefore, this equation applies to any steady-state microelectrode cell, regardless of the shape and size of the electrode, and with the sole provision that the cell has a geometry that permits a diffusive steady state and that the auxiliary electrode is large enough to remain depolarized. [Pg.359]

Figure 4.8 Cell system for coulometric titration by a platinum generator electrode and an isolated auxiliary electrode system includes provision for potentiometric endpoint detection. Figure 4.8 Cell system for coulometric titration by a platinum generator electrode and an isolated auxiliary electrode system includes provision for potentiometric endpoint detection.
Figure 5.26 Mercury-pool electrodes (a) cell with provision for pool replacement (b) plastic cup for pool (eu working electrode e2, auxiliary electrode e3, reference electrode). Figure 5.26 Mercury-pool electrodes (a) cell with provision for pool replacement (b) plastic cup for pool (eu working electrode e2, auxiliary electrode e3, reference electrode).
Safe location of auxiliary electrical equipment, transformers, switch gear. Provision of back-up utility supplies and services. [Pg.375]

A specific correction was introduced for the auxiliary services of the producers in the public energy sub-sector, whose purpose is to partly reduce the risk of an inadequate number of allowances, caused by the provision of auxiliary services and an increase in power electricity production. A maximum of 200,000 allowances, determined as the number of MWh of auxiliary services related to an increase in the output (positive regulation, dispatching reserve, quick start) provided in 2001 (data provided by CEPS a.s., electricity network provider) multiplied by a coefficient of 0.6 is added to the basic allocation. Because this adjustment is made inside the sector (no allowances were deducted or added for such purpose), adding these auxiliary services allowances to the basic allocation leads to an increase of the allowances to be allocated for that sector, and the allocations had to be reweighted back to the original number of allowances before this correction. Only three companies received this correction. Any bonuses for early action, CHP and CZT corrections were then added to this reweighted basic allocation,... [Pg.285]


See other pages where Auxiliary provisions is mentioned: [Pg.310]    [Pg.310]    [Pg.872]    [Pg.76]    [Pg.1008]    [Pg.538]    [Pg.539]    [Pg.156]    [Pg.426]    [Pg.54]    [Pg.1094]    [Pg.1255]    [Pg.276]    [Pg.523]    [Pg.14]    [Pg.336]    [Pg.4]    [Pg.177]    [Pg.167]    [Pg.612]    [Pg.122]    [Pg.127]    [Pg.696]    [Pg.167]    [Pg.612]    [Pg.202]    [Pg.436]    [Pg.1028]    [Pg.4]    [Pg.14]    [Pg.142]    [Pg.1032]    [Pg.434]    [Pg.201]    [Pg.876]    [Pg.51]    [Pg.52]    [Pg.148]    [Pg.279]    [Pg.157]   
See also in sourсe #XX -- [ Pg.310 ]




SEARCH



Adequate Provision of Tank Auxiliaries

Provisions

© 2024 chempedia.info