Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Structural steel estimating procedure

Structural Steel - Use procedure in Section 19.3 to develop take-offs and cost. Break down by structures and pipe racks and don t forget to identify and estimate miscellaneous service ladders and platforms related to specific equipment items. [Pg.259]

Concrete and Structural Steel quantities can be easily checked with the quick estimating procedures in Chapter 19. [Pg.132]

This procedure is used to estimate the weight, fabricated cost, and erection hours of the various types of steel structures required in a chemical plant. It is a very good tool for checking contractors take-offt and estimates as well as discussing and evaluating field extras. [Pg.281]

Other workers have published improved procedures for inspecting both reinforced concrete and prestressed concrete structures with regard to determination of the embedded steel components [110]. A prototype ultrasonic procedure was developed to determine the condition of prestressed and pretensioned tendons in concrete. The application of electrochemical surface-mounted systems for estimating the rate of corrosion of reinforcing steel and other embedded steel components in large concrete structures was described using this technique. [Pg.239]


See other pages where Structural steel estimating procedure is mentioned: [Pg.1527]    [Pg.438]    [Pg.80]   
See also in sourсe #XX -- [ Pg.281 , Pg.282 , Pg.283 ]




SEARCH



Estimating structural steel

Estimation procedures

Steel structures

Structural estimability

© 2024 chempedia.info