Re-inspection of repaired and reworked product

The standard requires the supplier to re-inspect repaired and reworked product in accordance with the quality plan and/or documented procedures. [Pg.445]

Any product that has had work done to it should be re-inspected prior to it being released to ensure the work has been carried out as planned and has not affected features that were previously found conforming. There may be cases where the amount of re-inspection is limited and this should be stated as part of the remedial action plan. However, after rework or repair the re-inspection should verify that the product meets the original requirement, otherwise it is not the same product and must be identified differently. [Pg.445]

The inspection and test records should indicate the original rejection, the disposition, and the results of the re-inspection in order that there is traceability of the decisions that were made. [Pg.445]

2 Decide what products and processes will be governed by the nonconformity control procedures. [Pg.446]

4 Decide who the acceptance authority is to be for each product, project, or contract for each class of nonconformity. [Pg.446]


See other pages where Re-inspection of repaired and reworked product is mentioned: [Pg.445]   


SEARCH



Inspection and repairs

Product inspections

Production inspection

Repair and rework

Reworking

© 2024 chempedia.info