Practical Considerations During Installation

After another review of the practical constraints and technical considerations, it was concluded that an eductor vacuum-enhanced recovery system would be feasible and still be cost-effective and efficient. In all, 11 6-in.-diameter wells extending to a depth of 28 ft were installed at strategic locations in the area where product seeps were observed. Each well was serviced by a high-pressure supply and a low-pressure return line. A basic domestic-type deep-well eductor was installed in each well, attached to a drop pipe that extended to 25 ft below the surface. A check valve on the drop pipe prevented backflow into the well during service. The top of the casing... [Pg.367]


See other pages where Practical Considerations During Installation is mentioned: [Pg.23]    [Pg.167]    [Pg.140]    [Pg.23]    [Pg.122]    [Pg.687]    [Pg.1729]    [Pg.56]    [Pg.113]    [Pg.806]    [Pg.156]    [Pg.31]    [Pg.900]    [Pg.32]    [Pg.189]    [Pg.53]    [Pg.181]   


SEARCH



Practical considerations

© 2024 chempedia.info