EXHIBIT 17-3 Portion of Pipe Support Location Plan Using a Referenced Piping Layout Drawing... [Pg.417]

Figure 12 shows the plan and elevation views of a process unit piping (9). A dmm is supported off the piperack. Heat exchangers are located far enough back from the support columns so that they are accessible and their shell covers can be removed. Pumps are located underneath the piperack, but sufficient room is provided for maintenance equipment to access the motors and to remove the pump if necessary. The motor is always oriented away from the process equipment and located on that side of the piperack. Instmment valve drops are shown supported from the columns. The instmment trays themselves mn on the outside of the support columns. Flat turns are only made from the outside position of the piperack. Nozzle-to-nozzle pipe mns are made whenever possible. Larger lines are located on the outside of the piperack. Connections to nozzles above the rack are made from the top... [Pg.80]

Locations of bends and supports for pipes almost decided (make 3D models). Routes of all electrical cables planned, and suitable foundations and supports for all high-voltage equipments made. [Pg.67]


See other pages where Pipe support location plan is mentioned: [Pg.415]    [Pg.415]    [Pg.391]    [Pg.10]    [Pg.504]    [Pg.285]    [Pg.40]    [Pg.116]    [Pg.420]    [Pg.53]   