Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Management of the demolition and general controls

Demolition hazard control involves implementing measures which reduce the risk at the demolition site. Where legislation requires specific methods to control the risk, these must be used. [Pg.165]

As discussed in Chapter 6, there is a recognized hierarchy of controls in health and safety ranging from the most to the least effective. This hierarchy can be applied directly to the demolition process. The elements of the hierarchy are  [Pg.165]

Elimination is the most effective control measure. This involves removing the hazard or hazardous work practice from the site, by the following actions  [Pg.165]

Substituting or replacing a hazard or hazardous work practice with a less hazardous one could include the following  [Pg.165]


See other pages where Management of the demolition and general controls is mentioned: [Pg.165]   


SEARCH



Demolition

Demolition management

Management and control

Managers general

© 2024 chempedia.info