Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Manage changes to the strategy

Copyright International Society of Autcm cn Prcvided by IHS urwler license with ISA [Pg.27]

No reproduction or networking permitted without license from IHS [Pg.27]

Referto ISA-TR84.00.03 for additional guidance of determining the competency of those associated with the mechanical integrity plan. [Pg.28]

Knowledge evolves over time as research and development yields operational enhancements to process facilities. ISA-TR84.00.04-1 Annex R provides examples of key performance indicators that can be used to monitor aspects of the SIS lifecycle. Events involving abnormal operation may identify weaknesses in the risk-reduction strategy, leading to the need for more safeguards and improved performance metrics. New ideas identify ways to lower risk further. [Pg.28]

Update documents to as-built status, incorporating changes made since the last formal drawing/document revision. Maintain documentation under revision control for the life of the equipment. Documentation should be traceable to the process hazard analysis and should be auditable. [Pg.28]


See other pages where Manage changes to the strategy is mentioned: [Pg.22]    [Pg.27]   


SEARCH



Change Manager

Change management

Managing the Change

The Strategy

© 2024 chempedia.info