Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Prototype Building

Prototyping basically provides a 3-D model suitable for use in the preliminary evaluation of form, design, performance, and material processing of products, molds, dies, etc. When properly used this automatic/fast system can accelerate product development, improve product quality, and time to the market for a product. [Pg.447]


Once you ve determined what you need to evaluate with a particular prototype, build the prototype using production equipment and staff as much as possible. This enables you to validate several key items ... [Pg.265]

Conduct flammability and impact tests on alternative CH2-ISS outer shell materials select optimum for prototype build... [Pg.219]

Figure 2 Serviceability Analysis of a Design Can Be Performed Prior to a Prototype Build. Here the Jack human figure is used to analyze the maintenance access to an electrical box inside of the aircraft nose cone. Eye views and collision detection can help the designer during the evaluation process. (Courtesy EMBRAER)... Figure 2 Serviceability Analysis of a Design Can Be Performed Prior to a Prototype Build. Here the Jack human figure is used to analyze the maintenance access to an electrical box inside of the aircraft nose cone. Eye views and collision detection can help the designer during the evaluation process. (Courtesy EMBRAER)...
Mn(CO)3(jU3-OH) 4 2H2NCH2CH2CH2NH2] , 79, is depicted in Figure 5.3. The hydroxo complex 78 (M = Mn) can be considered a prototypal building block in the design of organometallic solid-state architecture. It is interesting to note that no short intermolecular contacts have been found in the crystal structure of the unsolvated compound [44]. [Pg.351]

Supprat for concurrent build periods Differentiation between production builds and prototype builds using effectivity. [Pg.412]

The specimen was designed based on a four-storey prototype building structure consisting of four three-bay frames spaced at 6 m, with RC infilling of the exterior frames only. The specimen was designed at full-scale to represent the two exterior frames of the prototype structure, spaced at 6 m and linked to a 0.15 m thick RC slab (Fig. 17.1b). [Pg.305]

Coclaurine is an important alkaloid because its demethyl analog, norco-claurine, can be regarded as the prototype building block of dimeric benzylisoquinoline alkaloid that are often referred to as biscoclaurine-type alkaloids. [Pg.216]

The efficiency of a vented secondary containment In retaining fission products is predicted from analytical work which applies the results of experiments on both the l/16-scale model and the actual prototype building. [Pg.150]

Whitman RV (1973) Damage probability matrices for prototype buildings, vol 380, Structures Publication. MIT, Boston... [Pg.1020]

Performance-Based Design Procedure for Structures with Magneto-Rheological Dampers, Fig. 6 Floor plan of prototype building... [Pg.1891]

The prototype building structure is intended to provide the basis for an MRF and DBF with MR dampers which can be constructed in the laboratory for future tests. Due to laboratory constraints, the prototype building structure and resulting MRF and DBF were designed at 0.6-scale. The MRFs are designed to satisfy the... [Pg.1892]

A simple single-story laboratory building, part of an industrial project, will be used as prototype building for this presentation. The building s plan view is 28.00 m by 15.00 m (Fig. 1), and there is a small loft in part of the building (Fig. 2). The roof is double pitched with minimum required clearance equal to 4.50 m (Fig. 3). The locations of exterior doors are fixed, imposing restrictions on... [Pg.2621]

Seismic Analysis of Steel Buildings Numerical Modeling, Fig. 1 Architectural plan view of ground floor of prototype building (out of scale)... [Pg.2622]

Fig. 16 Column base connections of prototype building, modeled as hinges... Fig. 16 Column base connections of prototype building, modeled as hinges...
If there is a diaphragm in the structure, as, for example, is the case with the composite slab of the loft in the prototype building, it is recommended to avoid the more complex option of modeling it with shell elements and instead create a master node that will be connected with all nodes of the diaphragm (Eig. 21). In this case, in order to account for uncertainties in the location of masses and in the spatial variation of the seismic motion, the calculated center of mass at each floor shall be considered as being displaced from its... [Pg.2630]

For the prototype building presented here. Excel spreadsheets for the calculation of snow, wind, and seismic loads are illustrated in Figs. 22, 23, 24, and 25. Issues that may require special attention include snow accumulation due... [Pg.2632]


See other pages where Prototype Building is mentioned: [Pg.178]    [Pg.447]    [Pg.11]    [Pg.544]    [Pg.3016]    [Pg.268]    [Pg.269]    [Pg.270]    [Pg.314]    [Pg.358]    [Pg.110]    [Pg.84]    [Pg.777]    [Pg.1890]    [Pg.1892]    [Pg.2621]    [Pg.2624]    [Pg.2624]    [Pg.2627]    [Pg.2628]    [Pg.2630]   


SEARCH



Prototypical

Prototyping

© 2024 chempedia.info