Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Process evaluation establishing proposal details

Prepare rough cost economics, including preliminary sizing and important details of equipment, factor to an order of magnitude capital cost estimate [34] (see also [19]), prepare a production cost estimate, and work with economic evaluation representatives to establish a payout and the financial economics of the proposed process. [Pg.3]

Becanse there are many factors involved in the dynamic mechanical compression of polyolefin foams, the Taguchi method was employed in a Perkin Elmer DM A7 dynamic mechanical analyser to establish a method to improve the measurement process. The signal-to-noise ratio was measured to determine how the variability could be improved. Control and noise factors were evaluated and levels chosen, with details being tabulated. Appendix A describes some of the factors. Tests were conducted on two closed cell foams. NA2006 foam is 48 kg/cu m LDPE and NEE3306 foam is 32 kg/cu m EVA. Different factors were shown to influence results for E and tan delta but an optimum combination is proposed for the simultaneous measurement of both properties. The results were less variable as frequency was increased. Small differences in the dynamic response of different materials should be measurable because of the low variability in the experimental results. 18 refs. [Pg.48]


See other pages where Process evaluation establishing proposal details is mentioned: [Pg.1]    [Pg.227]    [Pg.1]    [Pg.1]    [Pg.4]    [Pg.18]    [Pg.49]    [Pg.421]    [Pg.173]    [Pg.29]    [Pg.251]    [Pg.145]    [Pg.73]    [Pg.173]    [Pg.31]    [Pg.233]    [Pg.282]   
See also in sourсe #XX -- [ Pg.15 , Pg.243 ]




SEARCH



Establishing

Evaluative Process

Process Details

Process detailed

Process evaluation

© 2024 chempedia.info