Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Patent system TRIPS

This segment foeuses on the breaker trip event and how both the train speed and the differential pressure between the regenerator and reaetor stripper ean be eontrolled during this event. Based on the breaker status, aetion is immediately initiated on the expander. Due to the improved reliability in train operation with these patented eontrol teehniques, the PRT ean be better utilized without saerifieing plant reliability. This leads to more effieient FCCU operation and the pay-baek period for tlie improved eontrol system ean be extremely short. [Pg.405]


See other pages where Patent system TRIPS is mentioned: [Pg.5]    [Pg.47]    [Pg.182]    [Pg.186]    [Pg.119]    [Pg.1408]    [Pg.33]    [Pg.131]    [Pg.236]    [Pg.3]    [Pg.164]    [Pg.118]    [Pg.118]    [Pg.299]    [Pg.847]    [Pg.132]    [Pg.273]   


SEARCH



Patenting Systems

Patents system

TRIPS

© 2024 chempedia.info