Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

INDEX team training

As pointed out above in (3), it is possible to have more than one machine/operator—this is double tooling. For example, use two sets of load/unload fixtures on an indexing fixture to reduce idle time while waiting for the machine to cut. Or one person can service two machines (i.e., 1 operator/2 machines or 0.5 operator/machine). It is also possible to have 0.67 or 0.75 operators/ machine. Do this by assigning 2 people/3 machines or 3/4, that is, having the workers work as a team, not as individuals. This will require cross-trained operators, which is very useful when someone is absent. [Pg.1379]

ABSTRACT This article studies the basic principle of mine rescue training, and carries on system analysis from the aspects of physical indicators, physical index standards, exercise prescriptions, physical indicators quantitative scheme and so on. For the requirements of a certain rescue team members body function, flexibility quality and endurance quality, the writer designs training programs and empirical... [Pg.583]


See other pages where INDEX team training is mentioned: [Pg.355]    [Pg.137]    [Pg.137]    [Pg.43]    [Pg.2323]    [Pg.609]    [Pg.62]    [Pg.275]   
See also in sourсe #XX -- [ Pg.94 , Pg.95 ]




SEARCH



Team training

Training 288 INDEX

© 2024 chempedia.info