Description of Production Installations and their Handling

1 The following documents of the manufacturer can be used as part of this qualification Description and instruction manual, installation drawings and - instructions, test and take over-certificates, and soft ware documentation. It is recommended to list and specify all necessary documents and their format in the purchase order, as this reduces time and effort for the buyer as well for the seller. [Pg.261]

The installations have been taken over from the seller at (date and time). Before the take-over, the seller has successfully corrected complaints listed in appendix 1 of the takeover protocol. The freezing and freeze drying plant is registered as GF 50/95/1 and the loading and unloading system as GF 50/95/2. [Pg.261]

2 The electrical power of both plants (XX kW) is supplied by the main power supply of building (F). An emergency diesel power supply ofYY kW is installed, which switches on 1 min after a power break. (If YY is not equal to XX The sequence of components to be connected to the emergency set is listed in directive (q), deposited at the control center). The control- and calculating system of both plants is connected by shielded cables to an independent power supply system, called computer power, that excludes influences of power variation or breakdown. [Pg.261]

3 The cooling water (maximum XX m3/h, maximum temperature +28 °C) is taken from the central supply system, which is protected against power failure and has an ample reservoir. No compressed air is used by GF50/95/1. All drives are electric or hydraulic. [Pg.261]

5 The calibration of all instruments of the installations is carried out by the calibraion service of the quality department, following the rules of that service. The computer programs used in the two installations are permanently tested by a program tested and accepted by the quality department. Errors or deviations are recorded and must to be evaluated by the quality department as given in directive (s). [Pg.262]

2 The electrical power of both plants (XX kW) is supplied by the main power supply of building (F). An emergency diesel power supply of YY kW is in- [Pg.379]

The control and calculating systems of both plants are connected by shielded cables to an independent power supply system, called computer power, that excludes influences of power variation or breakdown. [Pg.380]