Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Contractors acceptance criteria

Some organizations are uncomfortable with disqualifying bidders based on their safety record, but this is now a common practice in industry and government. Selection criteria range from a simple numerical EMR or incidence limits, to qualitative evaluations, to complex numerical scoring assigned to both performance and answers, to a series of questions. Some examples of simple contractor acceptance criteria are provided in Table 5-2. [Pg.57]

The structure of ROD is documented in Attachment 3 of ROSI III.l (Reference 3). Revision 5 of ROSI III.l reflects the current ROD organization and addresses the responsibilities and authorities of all ROD personnel and their interfaces with support groups. Based on the above, the criterion for the operating contractor to provide administrative procedures that document the structure of the reactor operations organization, including job descriptions, authorities, responsibilities, and interfaces with support groups is acceptably satisfied. [Pg.33]

Based on the above, we find that the criterion for the contractor to develop and maintain administrative procedures that clearly define operating standards of conduct, including those cited above, is acceptably satisfied. [Pg.36]


See other pages where Contractors acceptance criteria is mentioned: [Pg.57]    [Pg.35]    [Pg.124]    [Pg.57]    [Pg.33]    [Pg.37]    [Pg.38]    [Pg.39]    [Pg.39]    [Pg.39]   
See also in sourсe #XX -- [ Pg.57 ]




SEARCH



Contractors

© 2024 chempedia.info