Considerations for selecting construction method

Construction methods, i.e., equipment and related working methods, must meet the planning of the project, its specifications and the lines and levels set out in the contract. Equipment comprises dredging plant, means of transport of the dredged materials and equipment required at the fill area itself. [Pg.25]

The construction method will also be influenced by the prevailing conditions at the designated borrow area, along the route of transportation and at the proposed reclamation site, these include but are not limited to  [Pg.25]

In addition, physical and environmental issues as well as the availability of the anticipated dredging plant may have a significant impact on the work method adopted. For instance  [Pg.25]

The possibilities and limitations of the dredging plant in combination with the boundary conditions may also affect the technical and economic feasibility of a project. For instance  [Pg.26]

Technical and economic evaluations of the feasibility of a dredging project clearly require both a full inventory of the requirements of the Client (expressed as the desired properties of the fill mass) and the boundary conditions, and also a thorough knowledge of the characteristics of the available dredging plant and reclamation methods. [Pg.26]


See other pages where Considerations for selecting construction method is mentioned: [Pg.25]   


SEARCH



Consideration for selection

Considere construction

Constructability Considerations

Construction methods

Constructive methods

Method selection

Method selectivity

SELECT method

Selection Considerations

Selective methods

Selectivity considerations

© 2024 chempedia.info