Variables involved in the alkylation process model of Sauer et al (1964) and their bounds are summarized in Table 1.2. The SOO problem of this process is as follows. [Pg.14]

The above problem will be referred to as Problem A in the following. The 7 inequality constraints in equations 1.4e to 1.4k are the bounds on the 7 variables (X4, xs, X2, Xe, Xio, Xg and X3) in the original problem, and they arise from the elimination of these variables from the 7 equality constraints in the model thus making them dependent variables. The cost coefficients in the profit are alkylate product value ( 0.063/octane-barrel), olefin feed cost ( 5.04 arrel), isobutane recycle cost ( 0.035/barrel), fresh acid cost ( 10.0/thousand pounds) and isobutane feed cost ( 3.36/barrel). The optimal solution for this SOO problem is also presented in Table 1.2. The reader can verify this using the Excel file Alkylation.xls in the folder Chapter 1 on the compact disk (CD) provided with the book. [Pg.15]

Variables Lower Bound Upper Bound Optimum Value [Pg.15]


See other pages where Alkylation Process and its Model is mentioned: [Pg.13]   


SEARCH



Alkyl process

© 2024 chempedia.info