Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Traveling gantry

The arrangement in Exhibit 4-32 is an open elevated installation. Component removal may be accomplished widi mobile equipment or a traveling gantry, which rides on two rails along either side of the machine. A struaure must be provided to carry die rails out to the equipment drop zone. [Pg.72]

EXHIBIT 6-47 Fixed Structure with a Traveling Gantry... [Pg.137]

Cranes may be either a jib crane, tower crane or an overhead gantry travelling crane. The safety requirements are similar for each type. All cranes need to be properly designed, constructed, installed and maintained. They must also be operated in accordance with a safe system of work. They should only be driven... [Pg.225]

Overhead, gantry and under slung travelling cranes... [Pg.159]


See other pages where Traveling gantry is mentioned: [Pg.482]    [Pg.480]    [Pg.626]    [Pg.135]    [Pg.26]    [Pg.482]    [Pg.480]    [Pg.626]    [Pg.135]    [Pg.26]    [Pg.339]    [Pg.32]    [Pg.61]    [Pg.1693]    [Pg.1232]    [Pg.1232]    [Pg.1294]    [Pg.64]    [Pg.200]    [Pg.324]   
See also in sourсe #XX -- [ Pg.137 ]




SEARCH



Gantry

Travel

Traveling

Travelling

© 2024 chempedia.info