Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Three-part plant acceptance systems

In order to ensure safe commissioning of new plant and equipment, a three-part plant acceptance system should be utilised ... [Pg.178]

Part one consisted of a limited PRA to determine the potential for EFW system failure under various loss-of-main-feedwater transient conditions, with particular emphasis being placed on determining potential failures from human errors, common causes, single-point vulnerabilities, and test and maintenance outages. This evaluation applies to operating plants and plants under construction and not to advanced or future plants. Part two was composed of a deterministic review of the EFW system using the acceptance criteria of SRP Section 10.4.9 and the associated Branch Technical Position (BTP) ASB 10-1. Part three required a re-evaluation of the decay heat removal capability of the EFW system with respect to EFW system flowrate. Parts two and three apply to advanced or future plants. [Pg.343]


See other pages where Three-part plant acceptance systems is mentioned: [Pg.501]    [Pg.3689]    [Pg.4]   
See also in sourсe #XX -- [ Pg.251 ]




SEARCH



Plant system

Three-part

© 2024 chempedia.info