Starter dike

Figure 1 Upstream method for tailings dike construction. Tailings is naturally fractionated on the face of the dikes. Once the volume is full, another lift is placed above the starter dike. Figure 1 Upstream method for tailings dike construction. Tailings is naturally fractionated on the face of the dikes. Once the volume is full, another lift is placed above the starter dike.

See other pages where Starter dike is mentioned: [Pg.37]    [Pg.38]    [Pg.38]    [Pg.39]    [Pg.37]    [Pg.38]    [Pg.38]    [Pg.39]    [Pg.68]   
See also in sourсe #XX -- [ Pg.38 ]