PRV installation and line sizing

Process engineering and design using Visual Basic [Pg.266]

A PRV should be installed at the discharge of the compressor if the maximum possible discharge pressure exceeds the design pressure of the downstream piping and equipment. The maximum discharge pressure is estimated as follows  [Pg.266]