Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Preparation of a mould for operation

Before an HR mould commences operation, the following preparations are needed connection and checking of the mould temperature regulation system  [Pg.319]

When HR moulds commence operation, the following actions are performed in seqnence  [Pg.320]

The system must not be purged at high pressure with the mould open, as this carries the [Pg.320]

When thermally sensitive plastics are being processed, e.g., PBT, PET, POM, and nozzles with an insulation chamber are being used, the HR system may first be filled with a thermally stable plastic, e.g., PA 66. This prevents a distribution of melt which hangs in the chamber or creates what is known as an insulating layer. [Pg.321]

For the first 15 minutes of operation a watch should be kept over whether there are any melt leaks in the manifold space. Leaks may be indicated by shorts (incomplete filling of the mould) with a previously set specific batching capacity, a fall in injection pressure or gases escaping from the manifold space, etc. [Pg.321]


See other pages where Preparation of a mould for operation is mentioned: [Pg.319]   


SEARCH



A operator

Mould operation

Mould preparation

Moulding operation

© 2024 chempedia.info