Metra potential method

The second approach requires an independent sequence for each process path. This corresponds to the generation of a network plan using methods such as CPM (criticeil path method), MPM (metra potential method), and PERT (program evaluation tuid review technique). These techniques, as part of the project management, are employable for activities such as proper scheduling (Buighardt 1988). [Pg.2853]

Another form to present chronology of activities is the metra potential method (MPM) which also belongs to the deterministic network techniques like the CPM (Kuster et al. 2008). However, this method shall only be mentioned here. For further information see (Kerbosh and Schell 1975 Zimmermann et al. 2010). Regarding the CPM, its resulting network plan is rather bulky. Thus, the bulk chart (Gantt chart) is represented here as the content is the same but the presented form is more compact and with a higher readability. [Pg.298]

Kerbosh, J., Schell, H.J. (1975). Network planning by the extended metra potential method. [Pg.304]


See also in sourсe #XX -- [ Pg.298 ]




SEARCH



© 2024 chempedia.info